Architectural blueprints and tools for a condo kitchen renovation Vancouver project by QUAY Construction.

Cabinet Costs Vancouver: Stock vs Semi-Custom vs Custom (2026 Guide)

Table of Contents

Understanding cabinet costs Vancouver homeowners face is essential before starting a renovation. Cabinets typically represent 30–40% of a total kitchen budget, making them one of the most influential cost drivers in any Kitchen renovation Vancouver project.

 

Choosing between stock, semi-custom, and custom cabinetry impacts not only pricing but also timeline, durability, resale value, and design flexibility.

What Affects Cabinet Costs in Vancouver?

 

Several local factors influence cabinet pricing:

 

  • Material and finish selection
  • Manufacturing method
  • Lead times and supply chain
  • Condo delivery logistics
  • Installation complexity
  • Permit or inspection requirements if layout changes

 

In Vancouver, moisture levels and seasonal humidity shifts also affect material performance, especially for MDF vs plywood construction.

Stock Cabinets in Vancouver

 

Stock cabinets are mass-produced in standard sizes and finishes.

 

Average Cost (Installed)

 

$150 – $350 per linear foot

Typical 10×10 kitchen: $8,000 – $14,000 installed

 

Pros

 

  • Lowest upfront cost
  • Fast availability
  • Suitable for cosmetic upgrades

 

Cons

 

  • Limited sizing flexibility
  • Fewer finish options
  • Lower material durability

 

Stock cabinetry works best when layout remains unchanged and budget constraints are tight.

Semi-Custom Cabinets in Vancouver

 

Semi-custom cabinetry offers modification within manufacturer limits.

 

Average Cost (Installed)

 

$350 – $650 per linear foot

Typical 10×10 kitchen: $14,000 – $24,000 installed

 

Pros

 

  • Expanded design options
  • Better material quality
  • More finish and hardware flexibility

 

Cons

 

  • Longer lead times
  • Higher installation complexity

 

Semi-custom cabinets strike a balance between affordability and design flexibility.

Custom Cabinets Vancouver Cost Breakdown

 

Fully custom cabinets are built to exact dimensions and specifications.

 

Average Cost (Installed)

 

$650 – $1,200+ per linear foot

Typical 10×10 kitchen: $24,000 – $45,000+

 

Pros

 

  • Maximum design flexibility
  • Superior material quality
  • Seamless fit for older Vancouver homes

 

Cons

 

  • Highest cost
  • Longest production time
  • Requires experienced installation

 

Custom cabinetry is often recommended for high-end homes, heritage properties, or when layout modifications require exact fit tolerances.

Architectural blueprints and tools for a condo kitchen renovation Vancouver project by QUAY Construction

Pricing Comparison Table

Cabinet Type

Cost Per Linear Foot

10×10 Kitchen Estimate

Lead Time

Stock

$150–$350

$8k–$14k

2–4 weeks

Semi-Custom

$350–$650

$14k–$24k

4–8 weeks

Custom

$650–$1,200+

$24k–$45k+

6–12 weeks

Permit & Inspection Considerations

Cabinet replacement alone typically does not require permits. However, when cabinetry involves:

  • Moving plumbing
  • Relocating electrical
  • Altering ventilation
  • Removing walls

Permit applications may be required under City of Vancouver building permits regulations.

Links to add:

Structural modifications must comply with British Columbia Building Code requirements, particularly when cabinetry integrates structural beams or appliance ventilation systems.

Architectural blueprints and tools for a condo kitchen renovation Vancouver project by QUAY Construction.

Condo Cabinet Installations & Strata Rules

 

In condo buildings, cabinetry upgrades may require:

 

  • Strata approval
  • Elevator bookings
  • Insurance documentation
  • Work-hour compliance

 

Homeowners planning cabinetry within strata buildings should consult experienced condo renovation Vancouver specialists before ordering custom units.

Best Cabinet Option for Your Budget

 

Choosing the right cabinetry depends on:

 

  • Total renovation scope
  • Property value
  • Resale timeline
  • Design expectations
  • Moisture resistance needs

 

Homeowners investing in long-term value often integrate cabinetry planning within a full Kitchen renovation Vancouver strategy rather than treating it as an isolated upgrade.

Timeline Impact on Renovation Schedule

 

Cabinet type significantly affects overall renovation timing.

 

Stock cabinets may allow a project to complete in 6–8 weeks total.

 

Custom cabinetry can extend full renovation timelines to 10–16+ weeks, especially if permits and inspections are required.

 

For broader planning considerations, consult kitchen renovations Vancouver professionals to coordinate cabinet production with demolition and inspection scheduling.

Architectural blueprints and tools for a condo kitchen renovation Vancouver project by QUAY Construction.

FAQ – Cabinet Costs Vancouver

Are custom cabinets worth the extra cost?

For high-value homes and unique layouts, custom cabinetry often improves resale value and functionality.

Do cabinets require permits in Vancouver?

Not typically, unless plumbing, electrical, or structural systems are modified.

How much of a renovation budget goes to cabinets?

Typically 30–40% of total kitchen cost.

What cabinet type is best for condos?

Semi-custom or custom often works best due to irregular layouts.

How long do custom cabinets take?

Production typically requires 6–12 weeks.

Final Thoughts

 

Understanding cabinet costs Vancouver homeowners face helps prevent budget surprises and timeline delays. Stock, semi-custom, and custom cabinets each serve different budget levels and property types.

 

The right decision depends on long-term goals, resale strategy, and how cabinetry integrates into your overall renovation plan.

Ready To Get Started?

Book Your Complimentary On-Site Design Consultation.
Share the Post:

Related Posts