Can You Move a Kitchen in a Condo? Plumbing Stacks, Slabs and What's Possible

Quick answer: Often you can move a condo kitchen a short distance, but rarely to the other side of the suite. In a concrete high-rise the sink drain has to fall by gravity to a shared plumbing stack in the walls and slab, and under BC’s Strata Property Act those shared pipes and the structure are strata business, so the strata has to approve the change and the City of Vancouver needs a plumbing permit for any fixture that changes location. In a Yaletown high-rise we moved the sink into a new waterfall island as part of a kitchen that came in at about $80K; most QUAY condo kitchens plan at $40,000 to $75,000+, and moving plumbing is one of the things that pushes a budget up.

So the useful question is not “can it move?” but “how far, and at what cost?” This guide explains what limits a layout change in a Vancouver condo, which fixtures move easily and which almost never do, and how we check a plan before anyone opens a wall. If you are already planning, our condo renovation service in Vancouver covers the strata paperwork, permits and every trade, and our condo kitchen renovations page shows real budgets.

What decides whether a condo kitchen can move

In a house, a plumber can usually run a new drain through the floor joists or the basement ceiling to almost anywhere. A concrete condo is different. Four things set the limits, and each one has to be checked for your building and your suite:

  • The drain stack. Kitchens and bathrooms drain into vertical stacks shared with the suites above and below. The stack doesn’t move, so every drain has to get back to it.
  • Drain slope. Drains work by gravity, so the further a sink moves from the stack, the more height the pipe needs to keep falling all the way there.
  • The concrete slab. The floor is structural concrete. Running a drain through it means coring a hole, and that is a structural change the strata controls.
  • Strata approval and permits. Shared pipes and the structure aren’t yours alone, so the strata approves the plan, and the City issues the plumbing permit.

Water supply lines are the easy part. They are small, pressurized and can run almost anywhere inside a wall or cabinet. It is the drain, and the vent that goes with it, that decides the layout.

Plumbing stacks and drain slope: the real limit

Many concrete towers repeat the same floor plan stacked floor after floor, so the kitchen sits over the kitchen below and the bathroom over the bathroom below. The stacks run up through those rooms. Your sink connects to the stack through a short branch drain that sits in the wall behind the cabinets or in the space between your floor finish and the slab.

Because that branch has to slope down continuously, a sink a short way from the stack is usually straightforward: the pipe can stay in the wall or the cabinet base. Move it further and the drain needs more drop than the space allows. That leaves three options, and each has a cost:

  • Raise the floor or build a platform to make room for the pipe. This changes floor heights, transitions and sometimes door clearances.
  • Run the drain inside new cabinetry or a wall along the back of the kitchen, which works for some peninsulas and islands near the stack.
  • Core through the slab and run the pipe in the ceiling space of the suite below. That means work inside a neighbour’s home, with their consent and the strata’s, and it is often where a plan stops.
Diagram: a sink near the drain stack drains easily; a sink moved far from the stack needs more drop than the floor build-up allowsConcrete slab (structural, strata-controlled)StackSink near stackshort run: fits in the wallSink moved farlong run: the pipe drops below the floor, into the slab
The further a drain runs from the stack, the lower it ends up. Past a point it would have to pass through the slab.
Before: closed Yaletown condo kitchen behind a wall with a small pass-through opening

The concrete slab: coring and scanning

When a drain has to pass through the floor, the slab is cored: a round hole is drilled through the concrete. The slab carries the building, and many concrete towers use reinforcing steel or tensioned steel cables set inside the slab, so the concrete is normally scanned before any coring to find what is inside. If the scan shows steel where the hole needs to go, the hole moves, or the layout does.

Coring also affects the people around you. It is loud, it usually has to happen inside the strata’s permitted work hours, and the pipe below the hole ends up in the suite underneath. That is why a strata may ask for drawings or an engineer’s review before it approves coring.

The same applies to walls and bulkheads. In a high-rise some of them hide structure, ducts or shared plumbing that has to stay. A wall that sounds easy to remove can turn out to carry a stack, and the plan then works around it.

What your strata has to approve

The rules come from BC’s Strata Property Act, and they explain why a kitchen move is a strata decision and not only yours:

  • Shared pipes are common property. The Act’s definition of common property includes pipes, ducts and similar facilities for water, sewage and drainage when they sit inside a floor, wall or ceiling that forms the boundary between strata lots or between a strata lot and common property, or when they serve another strata lot (section 1, definitions).
  • Your suite ends partway into the concrete. Unless the strata plan says otherwise, the boundary of a strata lot runs midway through the structural portion of the wall, floor or ceiling (section 68). Coring the slab works on that structure.
  • Alterations need written approval. Under the Standard Bylaws, an owner must get the strata corporation’s written approval before an alteration to a strata lot that involves the structure of the building, common property located within the strata lot, or the parts of the strata lot the strata must insure. The strata must not unreasonably withhold approval, but it can require you to agree in writing to take responsibility for expenses relating to the alteration (Schedule of Standard Bylaws, bylaw 5).

Many buildings have their own bylaws on renovations, so read the bylaws filed for your building as well. In practice, Vancouver stratas usually ask for a written renovation request with drawings, proof of insurance and a WorkSafeBC clearance, and they set rules for work hours, elevator bookings and flooring. Our guide to strata approval for a condo kitchen shows what to send and when.

Permits for moving plumbing in Vancouver

The City of Vancouver’s plumbing permit page is direct about it: “You will need a permit to install, change, or upgrade any part of a plumbing system.” The exemptions include repairing or replacing fixtures “as long as they remain in the same location” (City of Vancouver: Get a plumbing permit).

That gives you a simple test. Swapping a sink, faucet or toilet in the same place is a replacement. Moving the sink to an island, shifting a toilet or relocating a shower is a change to the plumbing system, and it needs a permit and inspections. Gas, electrical and structural work have their own requirements, which we confirm with the City for your scope. Strata approval and the permit are separate steps; you need both.

How hard is each fixture to move?

FixtureWhat limits itUsually
Kitchen sinkDrain slope back to the stackA short move, such as into an island or peninsula near the old wall, is often possible
DishwasherDrains through the sink plumbingMoves with the sink
Fridge water lineSmall supply line onlyEasy to reroute
Electric range or induction cooktopA dedicated circuit and panel capacityFlexible, if the wiring route works
Gas rangeBuilding gas piping and a licensed gas fitterHarder; many owners keep the location
Range hoodThe existing exhaust duct routeOften tied to the current cooking wall
ToiletLarge drain set into the slab, close to the stackThe hardest fixture to move
Shower or tubDrain location in the concreteSmall shifts sometimes; keeping the drain area is easiest
VanitySmall drain, usually in the wallShort moves along the same wall are common
New in-suite laundryDrain, water, power and dryer ventingSubject to building and strata approval

Kitchen layout changes that usually work

Most condo owners who ask about moving a kitchen really want the kitchen to feel part of the living space. That rarely needs the kitchen to move. These changes deliver most of the result while keeping the plumbing close to where it is:

  • Open the wall or bulkhead between the kitchen and the living room, once we know what it hides.
  • Turn the sink run into a peninsula or island near the existing drain, so you face the room while you work.
  • Extend along the same wall with tall pantries and storage. Cabinets need no drain at all.
  • Keep the cooking wall where the hood duct and gas line already run, and put the money into cabinetry and lighting.
  • Switch to induction if you want flexibility for the cooktop, subject to the electrical capacity of the suite.

The plans that rarely work are the ones that put the sink on the far side of the suite, for example on a window wall away from the stack, or that swap the kitchen and a bedroom. Those depend on long drain runs or coring into the suite below, and a strata can reasonably say no.

Quartz waterfall island with black undermount sink and three pendant lights in a Yaletown condo kitchen

Moving a bathroom in a condo

Bathrooms are tighter than kitchens. The toilet has the largest drain in the suite, and it sits close to the stack, so moving it more than a short way is rarely practical. Shower and tub drains are set into the concrete as well, so a new shower usually goes where the old tub or shower drained. A vanity is the easiest piece to shift, because its drain is small and usually runs in the wall.

That still leaves plenty of room to improve a condo bathroom: replacing a tub with a walk-in shower over the same drain area, a wider or floating vanity on the same wall, better storage and lighting. Our post on condo bathroom renovation costs, strata rules and stacks covers budgets, and the bathroom vanity sizes guide helps you size a new vanity to the wall you have.

Two Yaletown kitchens we changed

Both of these are concrete high-rise suites in Yaletown, and both started as closed kitchens behind a wall. Neither kitchen moved to a new room; both changed how they open to the suite.

Yaletown open-concept kitchen, about $80K (2023). A closed galley behind a wall with a small pass-through. We took the wall out, opened the kitchen to the living room and the windows, and built a long quartz waterfall island extended into what had been storage space. The sink moved from the galley wall into the new island, with deep drawers and a built-in wine fridge. The cooking wall was rebuilt with an induction cooktop, wall oven and stainless hood.

Yaletown condo kitchen expansion, about $43K + GST (started November 2024). A kitchen tucked behind a wall and bulkhead. We removed the bulkhead and built a double-sided peninsula with the sink and prep space on the kitchen side and storage facing the living room, then extended the kitchen along the back wall with L-shaped millwork and a tall pantry. The existing range, fridge and dishwasher were kept. The strata approved the renovation request in October 2024; it required laminate with an acoustic underlay rated IIC 73 and STC 72 and limited elevator bookings to four-hour windows, and the kitchen and bathroom were planned together on a 17-working-day schedule.

Yaletown condo living room looking into the renovated kitchen through a widened opening with a quartz peninsula and bar stools

How we check a layout change before you commit

  1. Look at the plan and the bylaws. We read your strata’s renovation bylaws and look at where the kitchen and bathrooms sit relative to the suites above and below, which tells us roughly where the stacks run.
  2. Find the stack and the drain route. On a site visit we confirm where the existing drain connects and how much height there is between the floor finish and the slab.
  3. Decide whether the slab is involved. If the plan needs coring, we arrange scanning and the review the strata asks for before the design goes further.
  4. Send the strata request. We prepare the written renovation request with drawings, insurance and WorkSafeBC clearance, and wait for written approval.
  5. Apply for the permit. Moved fixtures need a City of Vancouver plumbing permit; other trades follow their own rules.
  6. Book the building. Water shut-offs, elevator bookings and work hours are arranged with building management before work starts.

Once approvals are in place, most standard QUAY kitchens take about 15 working days on site. The approval steps come first, so allow for them when you plan your dates.

What a layout change does to the budget

Condo kitchens with QUAY typically plan at $40,000 to $75,000+, and our real condo kitchens have come in at about $43K + GST to about $80K. In a condo, layout changes, moving plumbing and custom cabinetry raise costs the most. Keeping the sink near the stack is usually the single biggest way to protect the budget, and it is why so many good condo kitchens open up rather than move.

We price every project as a fixed-price proposal once the scope is set, so you see what a layout change costs before you decide on it. Our post on condo kitchen renovation costs in Vancouver breaks down real budgets from four QUAY condos.

Moving a kitchen or bathroom in a condo: FAQ

Can you move a kitchen in a condo?

Often a short distance, rarely across the suite. The sink drain has to slope down to a shared plumbing stack, so moving the sink into an island or peninsula near the old wall is often possible, while moving the kitchen to another part of the suite usually needs long drain runs or coring through the slab, which the strata may not approve.

Can you move plumbing in a condo?

Supply lines are easy to reroute. Drains are the limit, because they need a continuous fall back to the building’s stack and may have to pass through the concrete slab. Shared pipes in boundary walls and floors are common property under the Strata Property Act, so the strata has to approve changes to them.

Do I need strata approval to move plumbing in my condo?

Almost always. Under the Strata Property Act’s Standard Bylaws, alterations involving the structure, common property within your strata lot or parts the strata insures need the strata corporation’s written approval. Your building may also have its own renovation bylaws.

Do I need a permit to move a sink in Vancouver?

Yes. The City of Vancouver requires a plumbing permit to install, change or upgrade any part of a plumbing system. Replacing a fixture is exempt only when it stays in the same location, so a sink that moves needs a permit.

Can you move a toilet in a condo?

Usually only a short way, if at all. The toilet has the largest drain in the suite and sits close to the stack, set into the concrete. Most condo bathroom renovations keep the toilet where it is and improve the layout around it.