QUAY

Greater Vancouver Renovation Cost Guide

Understand renovation costs before you begin.

Explore preliminary planning ranges for kitchen, bathroom, condo, full-home and commercial renovations across Greater Vancouver—and learn what influences the final investment.

$
Preliminary planning information

Renovation pricing cannot be finalized until the project scope is clearly defined.

The ranges below are intended to help with early planning. They are not quotations or guarantees. Final pricing requires review of the property, design, materials, construction requirements and approved scope.

See what affects cost
Renovation Investment Planning

Price follows scope— not the other way around.

Two renovations that appear similar in size can have very different costs because of layout changes, existing conditions, material selections, structural requirements and the level of finish.

Reliable pricing begins by defining exactly what is being built and what must happen before construction can begin.

01

Define the scope

Room count alone is not enough. The work, inclusions, exclusions and responsibilities must be documented.

02

Select the finish level

Cabinetry, fixtures, tile, appliances and custom details can materially change the total investment.

03

Review the property

Access, age, existing construction and building requirements can create additional labour and planning.

04

Price the complete project

Design, permits, materials, labour, management and construction logistics should be considered together.

Preliminary Renovation Cost Ranges

Choose the renovation you are planning.

Select a project type to review a preliminary QUAY planning range and the common decisions that influence the total investment.

01
Typical QUAY Planning Range $40K–$80K+ Vancouver kitchen renovation
Custom or extensive kitchens may exceed this range.
Common Driver Custom cabinetry
Common Driver Layout changes
Kitchen Renovation Costs

A kitchen is a collection of connected systems.

Kitchen renovation costs are influenced by cabinetry, countertops, appliances, electrical work, plumbing, flooring, lighting and the extent of any layout or structural changes.

01 Cabinetry and millwork
02 Countertops and backsplash
03 Appliances and electrical
04 Plumbing and ventilation
05 Flooring and finishing
06 Structural or layout work
Explore Kitchen Renovations
What Determines Renovation Cost?

The final price is shaped by a series of connected decisions.

The most accurate budgets account for both what you can see in the finished space and the construction required behind it.

01

Scope and complexity

The number of spaces, systems and trades involved is often more important than the square footage alone.

02

Existing conditions

Older construction, water damage, asbestos, uneven surfaces and previous unpermitted work can add cost.

03

Structural changes

Moving load-bearing walls, enlarging openings and modifying framing may require engineering and permits.

04

Material selections

Tile, cabinetry, counters, fixtures, flooring and appliances create a wide range of possible budgets.

05

Custom fabrication

Bespoke millwork, stone, glass and specialty details require additional design, production and installation.

06

Plumbing and electrical

Relocating fixtures, upgrading panels or adding new circuits increases labour and permitting requirements.

07

Permits and consultants

Drawings, permit fees, engineering and professional coordination may form part of the total project cost.

08

Access and logistics

Condos, occupied homes, limited parking and restricted work hours can affect productivity and scheduling.

Where the Renovation Budget Goes

A complete budget includes more than finishes and labour.

The exact allocation changes from one project to another, but most professionally managed renovations involve these broad cost categories.

01

Construction labour

Demolition, preparation, skilled trades, installation, finishing and site supervision.

02

Materials and fixtures

Cabinetry, tile, flooring, plumbing fixtures, counters, hardware and finish materials.

03

Design and planning

Layout development, selections, documentation, coordination and pre-construction preparation.

04

Permits and consultants

Permit fees, engineering, architectural or specialized professional services where required.

05

Project management

Scheduling, trade coordination, communication, procurement, inspections and quality control.

06

Project contingency

A planning allowance for concealed conditions or owner-directed decisions outside the original scope.

The bars above illustrate relative project categories only. They do not represent fixed percentages for every renovation.

Costs by Renovation Type

Explore the service closest to your project.

Each project type has a different cost structure. Review the relevant service page to understand its design, construction and planning requirements.

01 Typical range: $40K–$80K+

Kitchen Renovations

Cabinetry, countertops, appliances, lighting, plumbing, electrical work and layout changes.

Explore Kitchens
02 Typical starting point: $25K

Bathroom Renovations

Waterproofing, tile, plumbing, fixtures, electrical work, cabinetry and glass.

Explore Bathrooms
03 Full condos often: $100K+

Condo Renovations

Interior construction combined with strata, access, building-protection and logistical requirements.

Explore Condos
04 Property and scope dependent

Full Home Renovations

Multiple rooms, structural work, building systems, finishes and coordinated construction.

Explore Full Homes
05 Use and condition dependent

Basement Renovations

Layout, moisture, insulation, plumbing, egress, mechanical systems and finishing.

Explore Basements
06 Design and permit dependent

Home Additions

Design, engineering, foundations, structure, building envelope, services and interior finishing.

Explore Additions
07 Condition and approval dependent

Heritage Renovations

Character retention, restoration, structural upgrades, approvals and sensitive construction.

Explore Heritage Homes
08 Custom scope and finish dependent

Luxury Renovations

Bespoke design, premium materials, custom millwork and specialized construction details.

Explore Luxury Projects
09 Broad range: $30–$350+ / SF

Commercial Renovations

Offices, retail, restaurants, cafés, medical clinics, dental clinics and specialized tenant improvements.

Explore Commercial
Setting a Realistic Renovation Budget

Your budget should reflect the outcome you expect.

A useful budget conversation connects the amount you plan to invest with the level of change, quality and customization you want to achieve.

01 Focused Renovation

Improve the existing space.

Best suited to projects that retain much of the existing layout and focus on selected finishes, fixtures or functional improvements.

  • Limited layout change
  • Selective finish replacement
  • Standard product selections
  • Reduced custom fabrication
03 Custom Luxury Renovation

Create something entirely personal.

Best suited to highly customized spaces with bespoke design, premium materials and specialized construction.

  • Custom layouts and details
  • Premium materials and fixtures
  • Bespoke millwork and fabrication
  • Complex technical coordination
Clear Pricing Before Construction

A detailed proposal should explain what the price includes.

QUAY proposals are developed around a defined scope so clients can understand what is included, what assumptions were made and how changes will be managed.

Discover Why QUAY
QUAY Project Proposal Prepared for review
Detailed project scope
Written inclusions
Allowances and selections
Construction schedule
Change approval process
Additional work No additional charge proceeds without written approval.
Managing Renovation Costs

Save through planning— not through shortcuts.

Cost control works best when decisions are made before construction, rather than by removing essential work after the project has started.

Better Ways to Control Cost
  • Define priorities before design begins
  • Retain layouts where it makes sense
  • Select materials within a planned allowance
  • Approve major decisions before construction
  • Coordinate procurement before the start date
  • Use one complete project scope
Shortcuts That Can Cost More
  • Pricing before the scope is defined
  • Choosing products after demolition
  • Ignoring permits or building requirements
  • Hiring disconnected trades without coordination
  • Comparing proposals with different inclusions
  • Removing necessary preparation work
Renovation Costs Across Greater Vancouver

Property and location can influence project cost.

Building type, access, municipal requirements, parking, working hours and local property conditions may affect renovation logistics and pricing.

Explore All Service Areas
Renovation Cost Questions

Common questions about renovation pricing.

These answers provide general planning guidance. A property review and defined scope are still required for project-specific pricing.

Plan Your Renovation Investment

Move beyond general ranges. Start defining your project.

Tell us about your property, renovation goals, preferred timeline and anticipated investment. We will help you understand the most appropriate next step.