QUAY

Condo Bathrooms · Vancouver

Condo bathroom renovations in Vancouver

Compact bathrooms renovated with careful waterproofing, smart storage and planning that respects your strata.

FixedPrice proposal before construction
365 Day workmanship warranty
01 Coordinated renovation team
Bathrooms in strata buildings

Condo bathrooms need a different approach

Renovating a bathroom in a condo involves more than the room itself. Plumbing connects to shared stacks, water shut-offs may need to be booked with the building, and any leak can affect the suites below.

QUAY Construction plans condo bathroom renovations with those realities in mind, from strata approval and elevator bookings to waterproofing done properly the first time.

Back to bathroom contractors in Vancouver
Strata and timeline

How long does a condo bathroom renovation take?

Our standard schedule for a typical condo bathroom is about 10 working days on site, once strata approval is in place. Hidden damage behind old tile can add time, so we price and approve any change in writing before the work happens.

01

Strata approval

Most Vancouver stratas ask for a renovation request, proof of insurance and a WorkSafeBC clearance before work starts, and set rules on work hours, elevator bookings and deliveries. QUAY prepares the paperwork and books the building logistics.

02

Protection and demolition

Hallways, elevators and the suite are protected, the old finishes are removed and recycled, and the walls and floor are opened up so any water damage can be found and fixed.

03

Plumbing and waterproofing

Plumbing is roughed in within the existing drain locations, then a membrane system goes behind and beneath the tile in the wet areas before any tile is set.

04

Tile, glass and finishing

Tile, vanity, glass, paint, finish plumbing and electrical, then a final clean and walkthrough. On our recent Yaletown condo bathroom, on-site work ran about three weeks, including three extra days to replace water-damaged drywall found behind the old tile.

What we handle

What a condo bathroom renovation involves

Requirements differ by building, so your strata bylaws are reviewed before the plan is finalised.

01

Tub-to-shower conversions

Replacing a rarely used tub with a walk-in shower.

02

Waterproofing

Membrane systems behind and beneath tile to protect your suite and your neighbours.

03

Compact vanities and storage

Wall-hung vanities, recessed cabinets and niches that free up floor space.

04

Plumbing within existing locations

Fixtures planned around the building drain stack to keep work practical.

05

Ventilation

Quiet, effective fans connected to the existing building exhaust.

06

Strata coordination

Approval documents, water shut-off bookings and elevator scheduling.

Bathroom renovation completed by QUAY Construction in Vancouver
Protecting the building

Water is the risk that matters most

In a multi-storey building, a failed shower can damage several homes. That is why substrate preparation and waterproofing are the most important steps in a condo bathroom.

We follow the membrane manufacturer's system and let you see the work before it is tiled over.

A Better-Managed Renovation

One bathroom. One accountable team.

Planning, pricing, procurement and construction are coordinated through one renovation process rather than managed as isolated pieces.

01

One Point of Contact

Design, trades, materials and scheduling are coordinated by QUAY, so you are not managing separate contractors or chasing updates.

02

Fixed-Price Proposal

Scope and pricing are established before construction so you know what is included and what the renovation is expected to cost.

03

Plan Before Construction

Materials, trades, sequencing and major project decisions are coordinated before the bathroom is taken apart.

04

365-Day Warranty

Our workmanship is backed by QUAY's 365-day We-Fix-It-Free warranty after project completion.

Renovation Details

Planned as a whole. Finished in the details.

Tile, vanities, glass and fixtures are coordinated so the finished bathroom feels considered in every detail.

View Renovation Projects
More Bathroom Renovation Guides

Explore related services.

Layout, fixtures, waterproofing and budget all shape a bathroom renovation. These pages cover the related topics in more detail.

Bathroom Renovation FAQ
Luxury Bathroom Renovation
Walk-In Shower Installation

The Process

Clear before construction. Organized through completion.

Each stage is defined before the next begins so decisions, materials and trades remain connected throughout the renovation.

01

Discovery Call

We discuss your home, priorities, desired timeline and expected investment to determine the right next step.

02

On-Site Consultation

We review the existing rooms, measurements, building conditions, layout opportunities and practical project requirements.

03

Scope & Proposal

The renovation is defined through a detailed scope, selections, pricing and construction plan before work begins.

04

Construction

Trades, materials and installations are coordinated through an organized schedule with consistent communication through completion.

Cost & Scope

Plan the renovation. Understand the investment.

Most complete bathroom renovations with QUAY fall in a $25K–$45K+ planning range.

Smaller condo bathrooms, up to about 45 sq. ft., typically start in the $25K–$35K+ range. Recent examples: our Yaletown condo bathroom came in at about $28K + GST, and the main bathroom in our Gastown condo at about $32K.

Condo-specific factors such as strata work hours, elevator bookings, concrete drain locations and any water damage found behind the old tile also affect cost. We define the scope with you and provide a fixed-price proposal before construction begins. For full ranges by room size, see our bathroom renovation cost guide.

Frequently Asked Questions

Condo bathroom questions answered

Do I need strata approval to renovate my condo bathroom?

In most buildings, yes, particularly where plumbing is involved. We help prepare what the strata asks for.

Can I move the toilet or shower in a condo?

Small shifts are sometimes possible, but drain locations in concrete buildings limit how far fixtures can move.

Can I replace my tub with a shower?

Yes, this is one of the most common condo bathroom upgrades.

Will the water be shut off in my building?

Some plumbing work needs a short shut-off, which is booked in advance with building management.

How much does a condo bathroom renovation cost in Vancouver?

Most complete bathroom renovations with QUAY fall in a $25K–$45K+ planning range, and smaller condo bathrooms typically start around $25K–$35K+. Our recent Yaletown condo bathroom came in at about $28K + GST. We provide a fixed-price proposal before construction begins.

How long does a condo bathroom renovation take?

Our standard schedule for a typical condo bathroom is about 10 working days on site once strata approval is in place. Hidden water damage or design changes can add time, and any change is priced and approved in writing first.

Does QUAY Construction provide a warranty?

Yes. QUAY Construction provides a 365-day workmanship warranty following completion of the renovation.

Start Your Project

Renovating a condo bathroom in Vancouver?

Tell us about your home, your priorities and when you'd like to renovate. We'll help you determine the right next step.