QUAY

Premium bathroom renovation completed by QUAY Construction
Design-Build Bathroom Renovations

Bathroom renovations designed around daily life.

QUAY plans and delivers complete bathroom renovations, coordinating design, waterproofing, plumbing, electrical work, tile, cabinetry, fixtures and finishing through one accountable team.

A Better-Managed Bathroom Renovation

Every detail connected. Every stage planned before construction.

A successful bathroom renovation depends on what sits behind the finished surfaces. Layout, waterproofing, drainage, ventilation, lighting, storage and material transitions must be coordinated before tile and fixtures are installed.

01
Design before demolition

Layout, storage, fixtures, tile and lighting are resolved before construction begins.

02
Waterproofing treated as a system

Substrates, membranes, slopes, penetrations and transitions are planned together.

03
Plumbing and electrical coordinated

Fixtures, outlets, switches, lighting and ventilation are aligned with the final design.

04
One accountable renovation team

Design, procurement, trades, communication and finishing remain connected from planning through handover.

Bathroom Renovation Expertise

Complete bathroom services. Explore the part of your project that matters.

Open a category to review QUAY’s bathroom renovation, design, plumbing, tile, accessibility and finishing services.

Detailed bathroom renovation with premium materials
One Coordinated Scope From the waterproofing behind the tile to the final fixture.
What Sits Behind the Finished Bathroom

Beautiful finishes matter. Technical execution protects them.

Tile and fixtures are only the visible layer. The long-term performance of a bathroom depends on substrate preparation, waterproofing, drainage, ventilation and the coordination of every penetration through the finished assemblies.

01
Waterproofing and drainage

Membranes, slopes, shower pans and drain locations planned as one complete system.

02
Plumbing rough-ins

Valves, supplies, drains and fixture dimensions coordinated with the final layout.

03
Lighting and ventilation

Task lighting, ambient lighting, receptacles and exhaust systems positioned intentionally.

04
Tile and finish transitions

Edges, corners, niches, thresholds and material changes resolved before installation.

Explore the QUAY Process
Premium shower waterproofing and tile installation
Built Behind the Finish Details planned to perform long after the renovation is complete.
The QUAY Bathroom Renovation Process

Decisions made before demolition. Construction managed in sequence.

Our process connects discovery, design, procurement and construction so fewer decisions remain unresolved once work begins.

View the Complete Process
Completed bathroom renovation
01 / Discovery and Feasibility

Begin with the room, the property and your priorities.

We discuss the existing bathroom, functional goals, design direction, property conditions, preferred timing and anticipated investment.

  • Project goals and priorities
  • Existing-room conditions
  • Property and access considerations
  • Timing and anticipated investment
Selected Bathroom Work

Different rooms. The same attention to every detail.

Explore selected bathroom layouts, shower details, custom vanities, tile and accessibility improvements.

View All Projects
Bathroom Renovation Planning

Scope shapes the investment. Planning protects the finished result.

Bathroom renovation costs and timelines depend on room size, layout changes, plumbing, waterproofing, tile, cabinetry, custom details and selected materials.

Complete Bathroom RenovationsFrom $25K

Complete projects commonly include demolition, waterproofing, tile, plumbing, electrical work, cabinetry, fixtures and finishing. Final pricing depends on the approved scope.

Explore Renovation Costs
Design and MaterialsSelection Dependent

Custom vanities, premium tile, specialized fixtures, shower glass and architectural details influence both investment and material lead times.

Explore Renovation Resources
Permits and Technical WorkProperty Dependent

Plumbing relocation, electrical work, structural changes and significant layout modifications may require permits, documentation or inspections.

Explore Permit Guides
Client Experience

Trusted for quality and careful coordination.

★★★★★
“QUAY Construction completed a bathroom renovation for us. From design to demo to the finished product, we couldn’t be happier.”
Guy Eriksen Verified Google Review
Bathroom Renovation Questions

Clear answers before your renovation begins.

Learn more about bathroom costs, timelines, design, waterproofing, permits and the QUAY renovation process.

Discuss Your Project

Complete bathroom renovations commonly begin around $25,000. Final pricing depends on the room size, existing conditions, plumbing changes, waterproofing, tile, cabinetry, fixtures and selected materials.

Many complete bathrooms require approximately ten working days on site once planning, selections and procurement are complete. Larger bathrooms, custom work, inspections and complex layouts may require additional time.

Yes. QUAY coordinates layouts, vanities, storage, tile, countertops, fixtures, lighting and material selections through its design-build bathroom renovation process.

In many bathrooms, an existing bathtub can be replaced with a walk-in shower. Feasibility depends on available dimensions, drainage, plumbing locations, structural conditions and the desired shower configuration.

Waterproofing requirements depend on the shower or bathtub configuration and existing structure. A complete assembly may include appropriate substrates, membranes, sealed penetrations, sloped surfaces and carefully detailed transitions.

Yes. Accessible bathroom renovations may include barrier-free showers, wider circulation, supportive fixtures, non-slip flooring, accessible storage and other improvements designed around long-term comfort and mobility.

Permit requirements depend on the municipality and scope. Plumbing relocation, electrical work, structural changes and significant layout modifications may require permits or inspections.

QUAY completes a final walkthrough, deficiency review, documentation and handover. Completed construction is supported by a 12-month workmanship warranty.

Start Your Bathroom Renovation

Let’s discuss your bathroom.

Tell us about the room, property, renovation goals, preferred timeline and anticipated investment.