Condos we've transformed.
Explore completed condo renovation projects by QUAY Construction across Yaletown, Downtown Vancouver and the West End.
From custom kitchens and complete bathroom renovations to integrated millwork, flooring, lighting and full interior transformations, every project is planned around the residence, the building and the people who live there.

Same city. Very different homes.
No two condo renovations are identical. Building age, floor plan, mechanical systems, strata requirements, elevator access and construction rules can change significantly from one property to another.
The projects below show how QUAY approaches complete condo renovations as coordinated interiors rather than disconnected kitchen, bathroom and finish upgrades.
Complete Interiors
Kitchen, bathroom, flooring, lighting, millwork and finishes coordinated through one renovation plan.
Custom Storage
Millwork and cabinetry designed around compact footprints where every usable inch of space matters.
Strata Projects
Building requirements, elevator bookings, protection, deliveries and trade access considered as part of project planning.
Design-Build
Design decisions, materials, construction scope and execution coordinated through one accountable renovation team.
View Full Project
↗
Brighter living. Smarter use of space.
This complete Yaletown condo renovation transformed an established downtown residence through a brighter custom kitchen, fully renovated bathroom, tailored millwork and coordinated contemporary finishes.
View Full Project
↗
Darker palette. Stronger identity.
A complete Downtown Vancouver condo renovation organized around custom black millwork, natural oak accents, quartz surfaces, upgraded storage and a contemporary bathroom to create one connected interior.
View Full Project
↗
Warm materials. Better everyday living.
This West End renovation modernized an established Vancouver condo with a custom kitchen, renovated bathroom, tailored storage and coordinated interior finishes while working within the practical constraints of an existing residential building.
Photos show details. Video shows the experience.
Walk through completed QUAY renovations to see how kitchens, bathrooms, storage and living areas connect within the finished residence.
Step inside the finished work.
Video reveals what individual photographs cannot: room-to-room continuity, proportions, circulation, storage and how the complete renovation works as one interior.

Complete Vancouver Condo Renovation
Walk through a completed Vancouver condo transformation featuring custom millwork, updated living spaces and carefully coordinated interior details.

West End Condo Transformation
Explore the transformation of an established two-bedroom, two-bathroom Vancouver condo and see how a complete interior renovation changes the way the residence feels and functions.

Luxury Condo Renovation
A comprehensive sub-penthouse transformation with a custom kitchen, updated bathrooms, fireplace detailing and coordinated contemporary finishes throughout the residence.
The suite is only part of the project.
Renovating inside a strata building requires another layer of planning. Construction needs to work within building procedures, shared spaces, access limitations and rules that do not exist on a typical detached-home project.
Strata Requirements
Contractor information, renovation applications, insurance documents and building-specific procedures may need to be addressed before construction begins.
Access + Elevators
Deliveries, demolition, cabinetry, countertops and trade access often need to be coordinated around elevator reservations and loading procedures.
Building Protection
Hallways, elevators and shared areas may require protection while demolition debris, materials and equipment move through the building.
Plumbing + Electrical
Existing building systems can influence fixture relocation, electrical work, plumbing modifications and what layout changes are practical.
Work Restrictions
Construction hours, noise restrictions, shutdown procedures and waste removal requirements must be incorporated into the project schedule.
Trade Coordination
Multiple trades need to work within a smaller footprint while respecting building procedures, neighbouring residences and scheduled access.
One residence. Many moving parts.
Complete condo renovations require design decisions, materials, trades, building logistics and construction sequencing to work together as one project.
Designed as one connected interior.
Cabinetry, storage, bathrooms, lighting and material transitions should feel deliberate from one room to the next. That continuity is what turns individual upgrades into a complete renovation.




Beautiful finishes are only half the job.
Understand The Building
A condo renovation exists inside a larger property with strata procedures, existing systems, neighbours and shared access that affect construction.
Plan Before Demolition
Materials, layouts, cabinetry dimensions, plumbing, electrical requirements and building logistics should be coordinated before construction advances.
Maximize Limited Space
Condo design often depends on making better use of the existing footprint through custom storage, cabinetry and more efficient planning.
Coordinate Every Finish
Kitchen, bathroom, flooring, millwork, lighting and painted finishes should connect visually so the completed home feels deliberate throughout.
Manage The Trades
Plumbing, electrical, cabinetry, tile, flooring, drywall, painting and finishing need to happen in the right order inside a constrained construction environment.
Keep One Team Accountable
QUAY coordinates the renovation as one project rather than leaving the homeowner to manage disconnected suppliers and trades independently.
Your residence could be the next transformation.
Tell us about your condo, building requirements, renovation goals, timing and anticipated investment.
Book a Discovery Call ↗Great projects start before construction.
The objective is not simply to start demolition quickly. It is to establish enough information before construction that the project can move forward in an organized and predictable way.
Discovery Call
Discuss the residence, renovation goals, property, timing and anticipated project investment.
Site Consultation
Review the condo, existing systems, access, layout opportunities and building considerations.
Design + Scope
Develop layouts, materials, cabinetry, fixtures, finishes and the construction requirements of the project.
Strata Coordination
Address relevant documentation, access, protection, scheduling and building-specific construction procedures.
Construction
Coordinate trades, materials, installations, site management and communication throughout construction.
Final Handover
Complete final corrections, cleaning and project review before returning the finished residence.
Explore condo renovation services and projects.
Condo Renovation Vancouver
Explore QUAY's complete Vancouver condo renovation services, project planning and construction process.
Explore ↗ 02Completed ProjectYaletown Condo Renovation
Explore the complete Yaletown project including kitchen, bathroom, millwork and interior finishing.
View Project ↗ 03Completed ProjectWest End Condo Renovation
Explore a complete West End transformation with custom cabinetry, bathroom upgrades and coordinated finishes.
View Project ↗ 04Your ProjectStart Your Condo Renovation
Tell us about your condo, building, renovation goals, timeline and anticipated investment.
Book a Call ↗Planning a condo renovation?
01 Where has QUAY completed condo renovations in Vancouver? ↓
The completed projects featured on this page include condo renovations in Yaletown, Downtown Vancouver and the West End. QUAY's condo renovation work includes kitchens, bathrooms, millwork, flooring, lighting and complete interior transformations.
02 Does QUAY handle complete condo renovations? ↓
Yes. Depending on the residence, a complete condo renovation can include demolition, design, cabinetry, kitchens, bathrooms, millwork, countertops, tile, plumbing, electrical work, lighting, flooring, drywall, painting and final interior finishing.
03 Can QUAY coordinate strata requirements for a renovation? ↓
Condo projects frequently involve building-specific procedures such as renovation documentation, contractor requirements, elevator reservations, common-area protection, loading access, permitted construction hours and trade scheduling. The exact requirements depend on the building and strata.
04 Can the layout of a Vancouver condo be changed? ↓
Layout changes may be possible when they provide a meaningful improvement to storage, circulation or function. Feasibility depends on existing structure, plumbing, electrical systems, mechanical conditions and applicable building or strata requirements.
05 Can QUAY renovate both the kitchen and bathrooms at the same time? ↓
Yes. Many complete condo renovations include the kitchen, bathrooms and surrounding interior finishes as one coordinated scope. Renovating the residence as a connected project can also create greater consistency between cabinetry, flooring, lighting, surfaces and finishes.
06 What should I consider before renovating a condo in Vancouver? ↓
Important considerations can include renovation goals, existing conditions, desired layout changes, strata requirements, building access, project budget, material selections and construction timing. Identifying these considerations early helps define a realistic project scope.
07 How do I start a condo renovation with QUAY? ↓
Start with a discovery call. We will discuss your condo, building, renovation goals, design status, anticipated timing and project investment before determining the appropriate next step.
Book a Discovery Call ↗
You've seen what we build.
Now tell us what you want to change. Start with a discovery call and tell us about your condo, building requirements, renovation goals, timing and anticipated investment.