Main condo bathroom near Science World with a new alcove tub, white subway tile surround, grey vanity and one-piece toilet
Completed QUAY Project
Condo Renovation · Near Science World

Condo Renovation near Science World

A move-in renovation for a new owner: both bathrooms rebuilt, new quartz counters and backsplash in the kitchen, popcorn ceilings removed, new lighting and window coverings, and fresh paint through a 1,000 sq. ft. condo, finished in about six weeks.

  • Two bathrooms
  • Kitchen countertops
  • Popcorn ceiling removal
  • Paint and lighting
Location Near Science World, VancouverBudget About $58K + GSTCompleted July 2022
✓ Condo renovations designed, coordinated and built by one accountable QUAY team.

Project story

A new owner, a tight timeline and a smart budget

The owner had just bought this condo a few minutes from downtown, near Science World, and wanted it fully refreshed before moving in. The kitchen cabinets were in good shape, so we kept them and put the budget where it showed: new quartz countertops and backsplash, a workstation sink and a matte black faucet.

Both bathrooms were fully renovated. The ensuite tub came out for a built-in shower with a custom glass enclosure, and the main bathroom got a new tub, white subway tile, a grey shaker vanity and matte black trim. Around them, we removed the popcorn ceiling, added new light fixtures in the bar, dining and hallway areas, installed roller blinds and painted the whole suite.

Because finishes were selected in a two-week design phase before demolition, the construction itself ran in about six weeks.

LocationNear Science World, Vancouver
SizeAbout 1,000 sq. ft.
Whole condoAbout $58K + GST
On siteJune 2 to July 12, 2022
KeptExisting kitchen cabinets
Warranty365-day workmanship

What we did

  • Kept the existing kitchen cabinets
  • New quartz countertops (upgraded to 3 cm) and backsplash
  • New workstation sink and matte black faucet
  • Ensuite: tub replaced with a built-in tiled shower and custom glass enclosure
  • Ensuite: new vanity, toilet, mirror, floor and wall tile
  • Main bathroom: new tub and trim, subway tile surround, vanity, toilet and mirror
  • Matte black shower and tub fixtures
  • Popcorn ceiling removal throughout
  • New light fixtures in the bar, dining and hallway areas
  • Roller window coverings
  • New baseboards in the bathrooms
  • Paint throughout and final clean

Video walk-through

Watch the finished condo

Filmed the week the project wrapped in July 2022: the refreshed kitchen, the two new bathrooms and the smooth, freshly painted ceilings.

Watch “Condo Bathroom Renovation Vancouver: Main Bath & Ensuite” on YouTube →

Cost

What this condo renovation cost

About $58,000 + GST

The signed contract was about $53,900 before GST. During the design phase, the owner chose about $4,400 in upgrades, including a different kitchen sink, toilets, tile, a thicker 3 cm countertop and window coverings, for a total of about $58,200 before GST.

Keeping the existing kitchen cabinets is what kept this project in the five figures. The money went into the two bathrooms and into the finishes that change how the whole suite feels: smooth ceilings, new lighting and paint.

  • Ensuite renovation: about $16,300
  • Main bathroom renovation: about $12,200
  • Kitchen countertops, backsplash, sink and faucet: about $9,400
  • Popcorn removal, lighting, blinds and paint: about $16,000
  • Owner-selected upgrades: about $4,400
  • Interior design coordination: included

Photos

Explore the finished condo

Condo kitchen near Science World with the original cabinets kept, new quartz countertops and backsplash, a workstation sink and matte black faucet
New quartz counters and backsplash on the existing cabinets
Renovated condo kitchen near Science World with new white quartz countertops and backsplash and a matte black faucet
The kitchen after the refresh
Workstation kitchen sink with matte black faucet set into new quartz countertops in a Vancouver condo
Workstation sink and matte black faucet
Renovated condo bathroom with a grey shaker vanity, arched black mirror and matte black towel bar
Grey shaker vanity and arched mirror
Matte black rain shower head and tub controls over white subway tile in a renovated condo bathroom
Matte black rain shower over subway tile
Second condo bathroom with a grey shaker vanity, white top and square black mirror
Second bathroom vanity

How it ran

Strata approval first, then six weeks on site

We filed the strata alteration application and the owner signed the strata agreement before work began, and we posted the notice of project for neighbours. Selections were finalized in a two-week design phase, so materials were ordered before demolition.

Demolition took two days. Countertops were measured the first week and installed in week three, while both bathrooms moved through plumbing rough-in, waterproofing, tile and drywall.

Timeline

  • May 2022: proposal signed, design and selections
  • Strata alteration application approved
  • June 2: demolition (two days)
  • June: bathroom rough-ins, waterproofing and tile; countertops installed June 21
  • Late June to early July: popcorn removal, lighting, paint and blinds
  • July 12, 2022: complete

Condo renovations in Vancouver → All condo projects →

Keep exploring

Related QUAY pages

See more of our condo work, or read how condo budgets come together in Vancouver.

Condo renovations in Vancouver

How QUAY plans and builds full condo renovations, from strata approval to handover.

Condo renovation services →

Popcorn ceiling removal

How we remove popcorn ceilings in occupied and empty condos, and what it costs.

Popcorn ceiling removal →

What a condo renovation costs

Real ranges for Vancouver condo kitchens, bathrooms and full-suite projects.

Read the cost guide →

FAQ

Condo refresh questions

Straight answers from this project's contract, schedule and invoices.

How much did this condo renovation near Science World cost?

About $58,200 before GST: a signed contract of about $53,900 plus about $4,400 in finish upgrades the owner chose. It covered two bathroom renovations, new kitchen countertops, backsplash, sink and faucet, popcorn ceiling removal, new lighting, roller blinds and paint throughout.

How long did it take?

About six weeks on site, from June 2 to July 12, 2022, after a two-week design and selection phase.

Can I keep my kitchen cabinets and just replace the countertops?

Often, yes. These cabinets were in good condition, so we kept them and installed new quartz countertops, backsplash, sink and faucet for about $9,400 before GST. It is one of the most cost-effective ways to update a condo kitchen.

Can you replace a condo bathtub with a walk-in shower?

Yes. In this ensuite we removed the tub and built a tiled shower with a custom glass enclosure. Strata approval is usually needed for bathroom work because it involves plumbing and waterproofing.

Is popcorn ceiling removal worth doing during a condo renovation?

It is easiest when the suite is already empty and protected for other work. Here it was done alongside the bathrooms and paint, so the whole condo was finished with smooth ceilings at once.