Kitchen renovation timeline in Vancouver
The stages of a kitchen renovation, what happens in each, and how planning ahead keeps construction short.
A short build depends on planning first
Most of what decides how long a kitchen renovation takes happens before anyone arrives on site. Design, selections and ordering of cabinetry and countertops all need to be complete so construction can run without waiting.
That is how QUAY Construction runs kitchen renovations on a 15-working-day construction schedule. Decisions are made and materials are ready before the existing kitchen is taken apart.
Back to Kitchen Renovations Vancouver ↗The stages of a kitchen renovation
Having materials on hand before demolition is what keeps you without a kitchen for as short a time as possible.
Discovery and consultation
We discuss your goals, then review the existing kitchen on site.
Design and selections
Layout, cabinetry, surfaces, fixtures and appliances are finalised.
Proposal and ordering
A fixed-price proposal is approved and long-lead items are ordered.
Demolition and rough-in
The old kitchen is removed and plumbing, electrical and any framing work is done.
Cabinets, counters and finishes
Cabinetry is installed, countertops are templated and fitted, then tile, paint and fixtures follow.
Walkthrough and handover
A final review of every detail, backed by our 365-day warranty.

What can make a kitchen take longer
Structural changes, permits, custom or back-ordered materials and changes made after work starts can all extend a project. These are identified in planning wherever possible.
Finalising selections early is the single most effective way to protect your completion date.
One kitchen. One accountable team.
Planning, pricing, procurement and construction are coordinated through one renovation process rather than managed as isolated pieces.
One Point of Contact
Design, trades, materials and scheduling are coordinated by QUAY, so you are not managing separate contractors or chasing updates.
Fixed-Price Proposal
Scope and pricing are established before construction so you know what is included and what the renovation is expected to cost.
Plan Before Construction
Materials, trades, sequencing and major project decisions are coordinated before the kitchen is taken apart.
365-Day Warranty
Our workmanship is backed by QUAY's 365-day We-Fix-It-Free warranty after project completion.
Planned as a whole. Finished in the details.
Cabinetry, surfaces, lighting and finishing details are coordinated across rooms so the finished home feels consistent.
View Renovation Projects ↗


Local service. Across the region.
We provide kitchen renovation services throughout Vancouver and the surrounding municipalities. Choose your city for local details.
Vancouver neighbourhoods we serve ↗All service areas ↗
Explore related services.
Style, materials, planning and budget all shape a kitchen renovation. These pages cover the related topics in more detail.
Luxury Kitchens ↗
Traditional Kitchens ↗
Scandinavian Kitchens ↗
Transitional Kitchens ↗
Porcelain Countertops ↗
Kitchen Permits ↗
Kitchen Renovation FAQ ↗
Kitchen Inspiration ↗
Modern Kitchen Renovation ↗
Custom Kitchen Cabinets ↗
Clear before construction. Organized through completion.
Each stage is defined before the next begins so decisions, materials and trades remain connected throughout the renovation.
Discovery Call
We discuss your home, priorities, desired timeline and expected investment to determine the right next step.
On-Site Consultation
We review the existing rooms, measurements, building conditions, layout opportunities and practical project requirements.
Scope & Proposal
The renovation is defined through a detailed scope, selections, pricing and construction plan before work begins.
Construction
Trades, materials and installations are coordinated through an organized schedule with consistent communication through completion.
Plan the renovation. Understand the investment.
Kitchen renovation cost in Vancouver is driven by scope, not square footage.
Schedule and scope go together. Both are set out in writing in a fixed-price proposal before construction begins.
Rather than quoting a generic square-foot price, we define the actual scope and provide a fixed-price proposal before construction begins. For typical ranges by room, see our renovation cost guides.
Kitchen timeline questions answered
How long does a kitchen renovation take? +
QUAY kitchen renovations run on a 15-working-day construction schedule. Design, selections and ordering take place before that, and larger scopes are scheduled individually.
How long will I be without a kitchen? +
For the construction period. We can suggest ways to set up a temporary kitchen area while work is under way.
What takes the longest in a kitchen renovation? +
Lead times for cabinetry and countertops, which is why they are ordered before demolition.
What causes delays? +
Late design changes, back-ordered materials, permit review and hidden conditions behind walls are the usual causes.
Do you renovate older and character homes? +
Yes. Older homes are reviewed for conditions such as outdated wiring, old plumbing and hazardous materials so they can be addressed in the plan rather than discovered mid-project.
Does QUAY Construction provide a warranty? +
Yes. QUAY Construction provides a 365-day workmanship warranty following completion of the renovation.
Want a clear schedule for your kitchen renovation?
Tell us about your home, your priorities and when you'd like to renovate. We'll help you determine the right next step.