QUAY

Bathroom Countertops · Quartz · Marble · Granite

Bathroom countertops in Vancouver

Quartz, marble and granite vanity tops templated to your vanity and installed with the sink and faucet you choose.

FixedPrice proposal before construction
365 Day workmanship warranty
01 Coordinated renovation team
Vanity tops

A small surface that does a lot of work

A bathroom countertop is splashed, wiped and leaned on every day, and it sits at eye level in a small room. The material, edge and sink style all shape how the vanity looks and how easy it is to live with.

QUAY Construction supplies and installs bathroom countertops across Vancouver, either with a new vanity or as a bathroom countertop replacement on existing cabinetry that is in good condition.

Back to Bathroom Renovations Vancouver
What to choose

Bathroom countertop options

Countertops are templated once the vanity is installed, so the fit is exact.

01

Countertop replacement

A new top, sink and faucet on a sound existing vanity.

02

Undermount sinks

Sinks fixed beneath the counter for easy cleaning.

03

Integrated sinks

Counter and basin in one continuous piece.

04

Vessel sinks

A basin that sits on top of the counter.

05

Edges and backsplashes

Edge profiles and matching splash details.

06

Double vanity tops

Long tops with two sinks.

Bathroom renovation completed by QUAY Construction in Vancouver
Choosing

Match the material to how you live

If you want a surface you never have to think about, quartz is the practical choice. If you love the character of natural stone, marble and granite reward a little care.

We show you samples alongside your tile and vanity finish.

Countertop Materials

Quartz, marble and granite bathroom countertops.

Each material has its own look and its own care needs.

Quartz countertops for bathrooms are engineered, non-porous and consistent in colour. Marble countertops bring natural veining that no two slabs share. Granite countertops are hard-wearing natural stone with a wide range of patterns.

  • Quartz: non-porous, stain resistant and needs no sealing
  • Marble: classic veining; softer and more porous, so it benefits from sealing and gentle cleaners
  • Granite: durable natural stone, sealed periodically
  • Porcelain: thin, heat and stain resistant slabs in stone looks
A Better-Managed Renovation

One bathroom. One accountable team.

Planning, pricing, procurement and construction are coordinated through one renovation process rather than managed as isolated pieces.

01

One Point of Contact

Design, trades, materials and scheduling are coordinated by QUAY, so you are not managing separate contractors or chasing updates.

02

Fixed-Price Proposal

Scope and pricing are established before construction so you know what is included and what the renovation is expected to cost.

03

Plan Before Construction

Materials, trades, sequencing and major project decisions are coordinated before the bathroom is taken apart.

04

365-Day Warranty

Our workmanship is backed by QUAY's 365-day We-Fix-It-Free warranty after project completion.

Renovation Details

Planned as a whole. Finished in the details.

Tile, vanities, glass and fixtures are coordinated so the finished bathroom feels considered in every detail.

View Renovation Projects
The Process

Clear before construction. Organized through completion.

Each stage is defined before the next begins so decisions, materials and trades remain connected throughout the renovation.

01

Discovery Call

We discuss your home, priorities, desired timeline and expected investment to determine the right next step.

02

On-Site Consultation

We review the existing rooms, measurements, building conditions, layout opportunities and practical project requirements.

03

Scope & Proposal

The renovation is defined through a detailed scope, selections, pricing and construction plan before work begins.

04

Construction

Trades, materials and installations are coordinated through an organized schedule with consistent communication through completion.

Cost & Scope

Plan the renovation. Understand the investment.

Bathroom renovation cost in Vancouver is driven by scope, not square footage.

Cost depends on the material, the size of the top, the edge and the sink style. We define the scope with you and provide a fixed-price proposal before construction begins.

Rather than quoting a generic square-foot price, we define the actual scope and provide a fixed-price proposal before construction begins. For typical ranges by room, see our renovation cost guides.

Frequently Asked Questions

Bathroom countertop questions answered

What is the best countertop for a bathroom?

Quartz is the most popular for its durability and low maintenance.

Is marble a good choice for a bathroom?

It is beautiful and widely used, but it can etch and stain, so it suits owners who accept some care and patina.

Can I replace just the countertop?

Yes, if the vanity is sound. The sink and faucet are usually replaced at the same time.

Does granite need sealing?

Yes, natural stone is sealed periodically.

How long does a bathroom countertop take to install?

Once the vanity is in, the top is templated, fabricated and then installed, so there is a short gap between measuring and fitting.

Do you renovate older and character homes?

Yes. We check older homes for outdated wiring, old plumbing and hazardous materials. That way, these issues are part of the plan instead of a surprise mid-project.

Does QUAY Construction provide a warranty?

Yes. QUAY Construction provides a 365-day workmanship warranty following completion of the renovation.

Start Your Project

Choosing a bathroom countertop?

Tell us about your home, your priorities and when you'd like to renovate. We'll help you determine the right next step.