
Flooring installation in Vancouver
Engineered hardwood, laminate, vinyl plank and tile, laid over the acoustic underlay your strata requires and finished with new baseboards and clean transitions.
Flooring installation in Vancouver: quick answers
Short answers to the questions we hear most.
- Do you take flooring-only jobs?
- Yes. Along with full renovations, QUAY takes flooring installation as a standalone job, from one room to a whole suite. The minimum job is $2,500.
- What underlay does my condo need?
- Your strata sets it. In a Yaletown condo the building required laminate over an acoustic underlay rated IIC 73 and STC 72. We submit the underlay specification with the strata application, as we did in a West End condo.
- Engineered hardwood or laminate?
- We install both. In a Kitsilano condo engineered hardwood replaced the old kitchen tile and carries through to the living room. See hardwood vs engineered hardwood.
- How is flooring priced?
- By area, product, underlay and prep, including removing the old floor, baseboards and transitions. You get a fixed-price proposal before work starts; our flooring cost guide covers the main factors.
A good floor starts with the rules
In a Vancouver condo the floor you want has to meet the floor your strata allows. Acoustic ratings, approved underlays, work hours and elevator bookings are settled before the old floor comes up.
QUAY Construction installs engineered hardwood, laminate, vinyl plank and tile in condos, houses and commercial spaces across Vancouver, as part of a renovation or as a standalone job with a $2,500 minimum.
Back to residential renovations ↗Flooring installation services
We check the existing floor, subfloor and strata requirements on site before recommending a product.
Engineered hardwood
Engineered hardwood through kitchens, living rooms and whole suites, laid as one continuous floor.
Laminate
Laminate flooring for condos and rentals, over the acoustic underlay the building requires.
Vinyl plank and vinyl tile
Durable, easy-to-clean vinyl for kitchens, offices, clinics and treatment rooms.
Tile floors
Porcelain and ceramic floors in bathrooms, kitchens and entries; see tile installation.
Acoustic underlay for condos
Underlay chosen to meet the strata's sound rating, with the specification submitted for approval.
Removal, baseboards and stairs
Old tile, carpet or laminate removed, new baseboards, transitions between rooms and flooring carried up the stairs.

Laminate over IIC 73 in a Yaletown condo
When we opened up this closed Yaletown kitchen, the building required laminate flooring over an acoustic underlay rated IIC 73 and STC 72, so the new floor would not carry sound to the suite below. A WorkSafeBC clearance was supplied with the strata paperwork.
Elevator use was limited to four-hour bookings, so deliveries and debris removal were planned around those windows. The kitchen portion came to about $43,000 before GST under the signed contract.
What decides the flooring job.
A few practical things set the cost and the result more than the flooring itself.
- Strata rules: the required sound rating, approved underlay, work hours and elevator bookings
- What comes out: tile, carpet or old laminate, and the baseboards along with it
- Subfloor: how flat and solid it is before the new floor goes down
- Continuity: one floor through the suite, transitions between rooms, and stairs
- Product: engineered hardwood, laminate, vinyl or tile for the way the room is used
Floors we have installed.
Real QUAY projects, before GST.
View Renovation Projects ↗Yaletown condo kitchen
Laminate over an acoustic underlay rated IIC 73 and STC 72, as the strata required; kitchen about $43,000.
Kitsilano condo kitchen
Engineered hardwood replaced the old tile and carries into the living room; kitchen about $60,000, completed 2022.
West End condo
Light engineered hardwood through the whole suite over an acoustic underlay, with the specification submitted to the strata.
Fairview chiropractic office
Vinyl plank through reception, hallway and every treatment room, laid after hours; two weeks, about $19,500 in today's costs.
Laid room to room. Finished at the edges.
Baseboards, transitions and the run of the boards are planned so the floor reads as one surface.



One renovation. One accountable team.
Planning, pricing, approvals and construction are coordinated through one renovation process rather than managed as isolated pieces.
One Point of Contact
Design, trades, materials and scheduling are coordinated by QUAY, so you are not managing separate contractors or chasing updates.
Fixed-Price Proposal
Scope and pricing are established before construction so you know what is included and what the work is expected to cost.
Plan Before Construction
Approvals, materials, trades and sequencing are settled before work starts.
365-Day Warranty
Our workmanship is backed by QUAY’s 365-day We-Fix-It-Free warranty after project completion.
Local service. Across the region.
We install flooring throughout Vancouver and the surrounding municipalities, on its own or alongside kitchen, condo and home renovations.
All service areas ↗Clear before construction. Organized through completion.
Each stage is defined before the next begins so decisions, approvals and trades stay connected.
Discovery Call
We discuss your home, priorities, timeline and expected investment to decide the right next step.
On-Site Consultation
We review the space, measurements, building conditions and the approvals the project will need.
Scope & Proposal
The work is defined through a detailed scope, selections, pricing and schedule before anything is opened up.
Construction
Trades, materials and inspections are coordinated through one schedule with consistent communication through completion.
Plan the floor. Understand the investment.
Flooring cost is driven by area, product, underlay and prep, not just the price of the boards.
Standalone flooring jobs have a minimum job of $2,500. For reference, the Kitsilano condo kitchen with engineered hardwood came to about $60,000, and the Fairview chiropractic office, with vinyl plank throughout, drywall repairs and a full repaint, about $19,500 in today's costs, both before GST. We define the scope with you and give you a fixed-price proposal before work begins.
Flooring questions answered
Can you handle the strata approval for new condo flooring?+
Yes. We prepare the alteration request, insurance certificate, WorkSafeBC clearance and the underlay specification the building asks for; see strata renovations and condo soundproofing.
Can the same floor run through the whole suite and up the stairs?+
Yes. In the West End condo engineered hardwood runs through every room, and in a two-level Downtown Vancouver condo the same flooring continues up the stairs so both levels read as one home.
Do you install vinyl plank in offices and clinics?+
Yes. Vinyl plank went through the Fairview chiropractic office, luxury vinyl tile into each new room at the False Creek health clinic, and vinyl plank with carpet tile into a Burnaby office.
Do you install cork flooring?+
Yes. A Dunbar kitchen got 6 mm glue-down cork, which is warm and soft underfoot for long stretches at the counter.
Can you replace carpet with laminate in a condo?+
Yes. In a North Vancouver condo refresh the carpet came out and laminate went in, along with new cabinets, a retiled bathroom, doors, trim and paint.
Can you lay tile over a heated floor?+
Yes. In a North Vancouver home we laid large porcelain floor tile over NuHeat floor heating; see tile installation.
Does QUAY Construction provide a warranty?+
Yes. Completed work is backed by our 365-day workmanship warranty.
Planning new floors?
Tell us about your home, your priorities and when you would like the work done. We will help you determine the right next step.