Renovation Permits in Burnaby: Which Projects Need One and How the City Reviews Them

In Burnaby, a renovation needs a City building permit when it alters the building: moving or removing walls, finishing or reworking a basement, adding a secondary suite, or adding a deck, patio cover, garage or other floor area. New or changed plumbing, electrical, gas and heating work each need their own trade permit. Minor work, such as replacing fixtures, cabinets and flooring or painting inside, does not need a building permit. Residential applications go through the City’s online My Permits Portal, and the City publishes no fixed review time, because it depends on the project and how complete the application is.

This guide sets out, project by project, what the City of Burnaby asks for, using the City’s own pages and guides, which are linked throughout. If you are planning a larger project, our home renovation service covers design, permits and construction under one team. For Burnaby work, QUAY confirms the scope, prepares the drawings and handles the applications, so you know which permits apply before any money is spent on construction.

The rules below describe the City’s general requirements. Your exact permits depend on your property, its zoning and the work drawn, so treat this as a planning guide and confirm your scope with the City’s Building Division (604-294-7130) or your contractor before you start.

Which renovations need a permit in Burnaby: project by project

The City’s starting point is broad: a permit is needed for “any construction project that includes the excavation, erection, enlargement, alteration, removal, fire repair or demolition of any building or structure.” It then lists the minor work that does not need one. Here is how that plays out for common home projects.

ProjectBuilding permit?Trade permitsWhat to know
Painting, new flooring, new cabinets, replacing fixtures in the same placeNo. The City lists these as minor worksUsually none. A plumbing permit applies if pipes are changed or extendedKeep the work non-structural. Once a wall, drain or circuit moves, the project is no longer minor
Kitchen renovation with a new layoutYes, if walls or structure are alteredPlumbing for a moved sink or dishwasher, electrical for new circuits, gas if a gas line movesA same-layout kitchen with new cabinets, counters and flooring can stay minor
Bathroom renovation with moved fixturesYes, if walls are alteredPlumbing for a moved toilet, shower or vanity drain; electrical if wiring changesReplacing a vanity or toilet in the same spot is the minor-works case
Removing or opening a wallYes. It is an alteration, and a structural one if the wall carries loadElectrical or plumbing if services run through the wallStructural changes may need an engineer's design
Finishing or reworking a basementYes. Interior alterations need a permitPlumbing for a new bathroom or bar sink; electrical for new circuitsIf the basement will be a rental suite, apply for it as a suite (see below)
Adding or legalizing a secondary suiteYesBuilding and subtrade permits, then all inspectionsZoning must allow a suite; one suite per home
Deck, patio cover, awning, garage, fence, retaining wall or hot tubYes. The City treats these as additions or new structuresElectrical or gas if a hot tub or heater is wired or pipedSome additions may also need a Development Permit
New furnace, boiler, heat pump or air conditioningDepends on the rest of the workA heating permit to install or replace heating and cooling systems; electrical or gas as needed
Condo or townhouse renovationDepends on the scope, as aboveDepends on the scopeStrata written approval for structural, exterior and common-property work, and a Consent to Construction form where the City requires it
Repairs after a fire or floodYes, a restoration permitAs needed for the repairRestoration applications are submitted in person at City Hall

Sources: City of Burnaby home improvement permits and residential trade permits pages. If you are in Vancouver rather than Burnaby, the rules and the issuing office are different; see which renovations need a permit in Vancouver.

The permits the City of Burnaby issues

For a house or duplex, the City of Burnaby issues the building permit and the trade permits that go with it. That is a useful difference from some other jurisdictions: in Burnaby, electrical and gas permits for homes come from the City, not from Technical Safety BC, except for gas installations over 409,000 BTU, which go to the provincial safety authority.

Building permit (alterations and additions)

The City separates alterations, which change the inside or outside of the home without adding floor area (including adding a secondary suite), from additions, which change the footprint or floor area or expand an accessory structure such as a garage, deck or patio cover. Attached garages count as additions; detached garages and new accessory buildings are treated as new buildings. Both alterations and additions are applied for online through the My Permits Portal, with drawings, and the City asks for a printed permit package with drawings at 36″ × 24″ to be kept on site for inspections.

Plumbing permit

Needed to install, change or upgrade any part of a plumbing system, including complete installations, re-piping, rough-ins, finishing and site services. Moving a toilet, adding a basement bathroom or relocating a kitchen sink all fall here.

Electrical permit

Needed for electrical work and installations, including low-voltage installations. A homeowner can get an electrical permit only for a single-family home they own, with no secondary suite or suite-ready elements, and only after showing the City satisfactory knowledge of electrical installation; otherwise a certified electrical contractor must take out the permit. Under a homeowner permit the owner does the work personally, and the City inspects at rough-in and at final (City homeowner electrical permit guide).

Gas, heating and fire sprinkler permits

A gas permit is needed to install, modify or upgrade any part of a gas system, including piping, venting and hook-ups, such as moving a gas range or adding a fireplace. A heating permit covers installing or replacing heating and cooling systems, and a fire sprinkler permit covers installing or changing a sprinkler system. Electrical, gas and plumbing permits can be applied for online; the City notes that a few trade permits are still handled in person.

Trade permits are tied to the building permit. The City’s permits and inspections process guide says trade applications can be submitted early but will not be issued until the building permit is, and that the owner of a detached single-family home may do their own trade work only if the City finds them capable. That option is not available for two-family dwellings or homes with a suite or laneway home.

Secondary suites: adding one or legalizing an old one

Burnaby’s Secondary Suite Program covers suites fully contained within a home. Building a new suite and legalizing one that was built without a permit follow the same path, because both need building and subtrade permits so the suite meets the BC Building Code. The City’s steps for an existing home are:

  1. Confirm your zoning allows a suite. Suites are allowed in single-family homes, duplexes, multiplexes, rowhouses and townhouses in the R1, R2 and A1 districts and some CD districts.
  2. Design the suite to meet the BC Building Code.
  3. Obtain the building and subtrade permits.
  4. Complete all inspections.
  5. Send the City the Supplementary Utility Fees Declaration. A rented suite adds a supplementary water and sewer fee to your utility notice.
  6. If you rent out the suite but do not live on the property, get a business licence.

Two limits catch people out. Only one suite is allowed per home, and it counts toward the lot’s total permitted dwelling units, so a lot already at its maximum cannot add one. In duplexes, multiplexes, rowhouses and townhouses, the BC Building Code allows suites only where units sit side by side or front to back, not stacked.

For the construction side, see what has to change when you convert a basement to a legal suite. QUAY’s Burnaby basement page lists legal suite conversions at about $75,000 to $100,000+ and about 6 to 8 weeks of work, with the zoning check, City permits and inspections handled by our team; see basement renovations in Burnaby.

Condos and townhouses: strata approval comes first

In a strata building, two separate approvals apply: the City’s permits for the work, and your strata corporation’s written approval. Under the Standard Bylaws in the Strata Property Act, an owner must get the strata’s written approval before altering a strata lot where the work involves the structure or exterior of the building, exterior doors, windows or skylights, balconies and railings, common property inside the strata lot, or parts the strata must insure. Altering common property or limited common property also needs written approval. The strata cannot unreasonably withhold approval for work inside a lot, but it can ask you to take responsibility in writing for related costs.

Many stratas have their own filed bylaws that go further, for example requiring approval for any plumbing, electrical or flooring change, so read yours before you design. On the City side, Burnaby’s process guide lists a Consent to Construction form signed by the strata council among the documents required where it applies. Strata approval, elevator bookings and work-hour rules are planned before demolition on QUAY’s Burnaby condo projects, and our guide to strata approval for a condo kitchen covers what to send and when.

Offices, shops and warehouses: tenant improvement permits

Burnaby handles work in existing commercial, industrial and multi-residential spaces through a tenant improvement (TI) building permit. The City’s tenant improvement permit guide says a TI permit is needed for any interior or exterior alteration or change of use, with examples such as adding a mezzanine or floor area, changing the interior layout or exterior elevations, and modifying a commercial kitchen exhaust system. A TI application needs complete drawings (structural, electrical and mechanical where they apply), an owner’s undertaking, and, where required, a Consent to Construction signed by the strata or property manager. The contractor also needs a valid Burnaby or Inter-Municipal business licence. The City’s permit pages note that commercial tenant improvement applications are still paper-based.

Main floor of the Burnaby office before renovation, where the new staff kitchen was built
The main floor of the Five Star office in South Burnaby before QUAY built the new staff kitchen.

QUAY’s own Burnaby work includes the Five Star Building Services office and warehouse renovation on Russell Avenue in South Burnaby: a design-build renovation of a two-storey office and its warehouse with two new staff kitchens, about 2,500 sq ft of new carpet, about 4,200 sq ft of painting and steel pallet racking, built in about eight weeks in summer 2025 for a contract in the $175,000 to $250,000 range before GST. For more on mixed office and industrial space, see our warehouse office build-out guide.

How Burnaby reviews a renovation permit, step by step

The City’s building permits and inspections process runs in six stages:

  1. Application. The registered owner, a tenant with authority to build, or an agent with a signed Agent Authorization form applies, with construction drawings, code-compliance documents, a signed owner’s undertaking (Schedule “F”) and a non-refundable application fee. Residential additions and alterations are applied for online through the My Permits Portal.
  2. Review. Staff check that the application is complete, then a Plan Checker reviews it against the BC Building Code and City bylaws, sends referrals to other departments, and tells you if corrections are needed.
  3. Issuance. Once the requirements are met, you pay the building permit fee (less the application fee) and any other charges that apply.
  4. Trade permits. Licensed trades apply for the electrical, plumbing, gas and fire protection permits once the building permit is issued.
  5. Inspections. The permit holder books each inspection with at least 24 hours’ notice. Depending on the work, inspections can include framing, insulation, plumbing, water pipe, gas vent and wiring.
  6. Occupancy. After the final inspections, the Building Inspector may issue a Certificate of Occupancy.

Two recent changes matter for 2026 projects. Permits issued on or after March 31, 2026 for applications made on or after January 1, 2026 are digital only (commercial tenant improvement and residential restoration applications stay on paper). And since July 1, 2026, the City says that for some projects a Development Permit is required before a Building Permit can be submitted or issued. Ask the City whether either change applies to your project before you set a start date.

How permits fit into a renovation schedule

The City does not publish a fixed review time for renovation permits. Its process guide says the time depends on the project’s complexity, whether the application is complete, how quickly the applicant responds to requests, and whether other approvals, such as a Development Permit, must come first. The practical lesson is to apply with a complete package and to treat the permit as part of the schedule, not something to chase once trades are booked.

QUAY’s published on-site times start after design, permits and materials are ready. For Burnaby, our service pages list most standard kitchens at about 15 working days on site, most complete bathrooms at about 10 working days, most basement renovations at about 4 to 6 weeks and legal suite conversions at about 6 to 8 weeks. Permits and material lead times usually set the start date, so plan for them first. See home renovations in Burnaby for how we plan a whole-home project.

Project (QUAY, Burnaby)Typical time on sitePublished price range
Standard kitchenAbout 15 working daysAbout $40,000 to $80,000+
Complete bathroomAbout 10 working daysFrom about $25,000
Basement renovationAbout 4 to 6 weeksAbout $35,000 to $100,000+
Legal basement suiteAbout 6 to 8 weeksAbout $75,000 to $100,000+

Times and ranges are from QUAY’s Burnaby kitchen, bathroom, basement and home renovation pages. Your proposal sets the actual scope, price and schedule.

Buying a home with unpermitted work

The City of Burnaby is direct about this: “As a homeowner you are responsible for any unpermitted work on your property,” even if it was done before you owned the home. If you find unpermitted work, the City asks you to contact the Building Department and apply for the appropriate permits. For an unpermitted basement suite, that means following the Secondary Suite Program steps above. If you are buying a home with a suite or a finished basement, ask the seller for the permit history before you commit. For comparison with the rules next door, see our Vancouver basement permit guide.

Burnaby renovation permit FAQ

Do I need a permit to renovate a kitchen in Burnaby?

Not if you only replace cabinets, counters, fixtures and flooring in the same layout, which the City lists as minor works. If you move or remove walls, you need a building permit, and moving the sink, adding circuits or moving a gas line needs plumbing, electrical or gas permits from the City.

Can I do my own electrical work in Burnaby?

Only in limited cases. The City issues homeowner electrical permits only to the registered owner of a single-family home with no secondary suite or suite-ready elements, who shows satisfactory knowledge of electrical installation and does the work personally. Otherwise a certified electrical contractor must take out the permit.

How long does a renovation permit take in Burnaby?

The City does not publish a fixed time. It depends on how complex the project is, whether the application is complete, how quickly you respond to requests and whether another approval, such as a Development Permit, has to come first.

Do I need a permit to build a deck in Burnaby?

Yes. The City treats decks, patio covers, awnings, garages, fences, retaining walls and hot tubs as additions or new structures, which need a permit, and some additions may also need a Development Permit.

Who issues electrical and gas permits for houses in Burnaby?

The City of Burnaby. It issues electrical, gas, plumbing, heating and fire sprinkler permits for houses and duplexes. Only gas installations over 409,000 BTU are permitted by the provincial safety authority instead.

Does a condo renovation in Burnaby need strata approval?

Yes, for work involving the structure, exterior, exterior doors and windows, balconies, common property inside the unit or parts the strata insures, under the Strata Property Act Standard Bylaws, and often for plumbing, electrical or flooring changes under your strata’s own bylaws. The City may also require a Consent to Construction form signed by the strata council.