First-Generation vs Second-Generation Restaurant Space: What It Means for Your Build-Out
By QUAY Construction · November 26, 2026 · Commercial
Quick answer. A second-generation restaurant space was built out for an earlier food business, so it may already have a kitchen exhaust hood, a grease interceptor, floor drains, washrooms and a gas line. When those systems fit your menu and still work, a café build-out can land toward the low end of QUAY’s published planning range of $180 to $260 per square foot. A first-generation space, a bare shell or a unit never used for food, needs every one of those systems built from scratch, which is why a full-service restaurant in a shell sits toward the top of the $250 to $400+ range. Either way, QUAY’s restaurant and café builds typically take 8 to 12 weeks of construction once permits are in place.
The catch is the word “usable.” A hood in the wrong place, an interceptor sized for someone else’s fixtures or a tired electrical service can cost almost as much to fix as building new. This guide explains what each term means, how the existing systems change your budget and schedule, and the checks to make before you sign. For the full build-out service, see our restaurant and café renovations in Vancouver.
What first-generation and second-generation mean
These are leasing terms, and landlords and brokers don’t always use them the same way, so treat a listing’s label as a starting point rather than a promise.
- First-generation space has never been built out for food service. It may be a new shell in a mixed-use building, with services stubbed to the unit, or a former office or store. Everything a kitchen depends on, from the exhaust route to the drains under the slab, is new work.
- Second-generation space was previously a restaurant, café or bar. Some or all of the kitchen infrastructure stays behind when the last tenant leaves: the hood and exhaust fan, make-up air, the grease interceptor, floor drains, sinks, washrooms, gas piping and sometimes a walk-in cooler or bar millwork.
What matters for your budget isn’t the label. It’s which of those systems are actually there, whether they are in the right place for your layout, and whether they are in good enough condition to keep. Your lease also decides who owns what was left behind and who is responsible for it, so read the landlord’s and tenant’s work schedules before you count anything as free. Our guide to landlord’s work vs tenant’s work explains how those schedules are usually split.
First-generation vs second-generation space at a glance
The table compares what each kind of space usually means for the systems that drive a restaurant budget. The last column is the check to make on a walkthrough before you sign.
| System | First-generation space | Second-generation space | What to check |
|---|---|---|---|
| Kitchen exhaust hood and make-up air | A new hood, exhaust fan, duct route and make-up air system, often among the longest lead items on the job | May be reusable if its size and position suit your cook line | Hood length and position, fan and make-up air working, where the duct runs through the building, service and cleaning records |
| Grease interceptor | New interceptor, with floor space, slab cutting and drain routing | Existing unit may stay if it is correctly sized for your fixtures | Size against your fixture list, which fixtures are connected, access for pump-outs, the last tenant’s maintenance records |
| Floor drains, sinks and water | Saw-cut slab and new under-slab drains and water lines | Existing drains save slab work if they line up with your layout | Drain locations against your sink and dish layout, hot water capacity, backflow devices |
| Washrooms | New washrooms planned around plumbing, accessibility and clearances | Usable washrooms lower the budget | Number, condition and layout of washrooms, and whether your work will trigger upgrades |
| Electrical service | Service sized from scratch for your equipment | Existing panel may or may not cover your equipment list | Panel capacity against ovens, fryers, espresso machines, dish machine and refrigeration |
| Gas | New gas line and meter coordination | Existing piping may serve some equipment | Pipe size and routing against your equipment, meter location |
| Health approval | Floor plans approved by Vancouver Coastal Health before construction | Still needs your own approval; the old permit does not transfer | Plan the VCH plan review into your schedule either way |
How the space you start with changes the cost
QUAY’s commercial renovation cost guide sets out these 2026 planning ranges for construction in Vancouver, before design and engineering fees, permit fees, kitchen equipment, furniture, signage and GST:
- Café, coffee shop or quick-service restaurant: $180 to $260 per sq ft. For a 1,500 sq ft unit, that is about $270,000 to $390,000.
- Full-service restaurant: $250 to $400+ per sq ft. For a 2,500 sq ft unit, that is about $625,000 to $1,000,000 or more.
The spread inside each range comes largely from the space you start with. Food service sits at the top of every commercial cost table because so much of the budget is behind the walls and above the ceiling: exhaust and make-up air, the grease interceptor, floor drains and sinks, and gas and electrical connections for equipment. In a first-generation space you pay for all of it. In a second-generation space you may pay for only the parts that don’t fit or don’t work.
Two things narrow the savings more often than people expect. First, a kitchen needs the same sinks, interceptor, exhaust and hot water however big the dining room is, so a small unit carries those fixed costs over fewer square feet. Second, existing systems only save money when your layout can use them where they are. If your cook line needs the hood on the opposite wall, the old hood is a demolition line item, not a saving. That’s why the ranges are for testing a lease, and why QUAY replaces them with a fixed-price proposal once we have seen the unit and your layout.
The lease is the other half of the math. A landlord may contribute a tenant improvement allowance toward the construction cost. Compare the build-out budget for each space you are considering against the rent and the allowance on offer, not the asking rent alone.

How it changes the schedule
Most QUAY restaurant and café builds take 8 to 12 weeks of construction once permits are in place and materials are ordered. Design, permits and the health plan review come first and are scheduled separately. Where a project lands in that range depends on how much of the kitchen is new and whether exhaust and grease systems already exist.
Exhaust hoods and rooftop mechanical units are often the longest lead times on a restaurant job. Reusing a suitable hood can take that item off the critical path. A second-generation space doesn’t skip the approvals, though. Vancouver Coastal Health says on its food service permits page that floor plans must be reviewed and approved before construction begins, for new premises, renovations and facilities that need alterations to meet current requirements, and that the annual permit is not transferable to a new owner. So even a light refresh of an existing restaurant needs its own plans, its own approval and its own inspection before opening.
On the City side, the City of Vancouver’s commercial tenant guide to City permit and licence processes says construction on private property needs a building permit before any work begins, and that a development permit may be required depending on the site’s zoning and the proposal. You will also need a business licence. Our commercial permits page explains how QUAY coordinates the applications with your designer.
Checking an existing hood and exhaust
The hood is often the most valuable thing a previous tenant leaves behind, and the easiest to overvalue. On a walkthrough, look at:
- Size and position. Measure the hood against the equipment you plan to put under it. A hood that covers a two-fryer line won’t cover a charbroiler, wok station and range added beside it.
- Whether it runs. Ask to see the exhaust fan and make-up air operate, and have your mechanical contractor confirm what condition they are in.
- The duct route. Find out where the exhaust goes: up through the building to the roof, or out a wall. In mixed-use and residential buildings, exhaust routing comes with building rules, and an existing route that the building has already accepted is a real advantage.
- Records. Ask the landlord or outgoing tenant for service and cleaning records and for the fire suppression system’s service tags. Gaps in the records are a question for your mechanical contractor before you rely on the system.
If the hood stays, it still has to appear on the floor plans you submit to VCH, whose orientation guide for new food premises operators lists ventilation equipment such as the range hood, and the grease trap, among the equipment floor plans must show.
Checking the grease interceptor
Metro Vancouver’s Food Sector Grease Interceptor Bylaw 365 requires commercial kitchens that discharge fats, oils and grease to the sewer, including restaurants, bars, bakeries and coffee shops, to install a correctly sized grease interceptor connected to all required fixtures. The operator must have it pumped out every 90 days, or sooner when fats, oils, grease and solids are more than 25% of the total liquid depth, and keep records of the cleanouts.
“Correctly sized” is measured against your kitchen, not the last one. If you add a dish machine, a second compartment sink or a prep sink, the existing unit may be too small, or the new fixtures may be in the wrong part of the unit to connect to it. Metro Vancouver’s grease interceptor sizing tool works from your fixture list, so draw the plumbing layout first and size the interceptor from it. Ask the outgoing operator for its pump-out records too: they show whether the unit has been maintained and when it was last serviced. Our guide to commercial kitchen requirements in BC covers the sinks and fixtures the interceptor has to serve.

Washrooms, power and gas
These three are where a second-generation space quietly saves, or quietly doesn’t.
- Washrooms. Usable washrooms lower the budget. New or rebuilt washrooms are planned around plumbing, accessibility and clearances. QUAY’s cost guide notes that changing the use of a space, or the extent of the work, can bring requirements for fire-life-safety, accessibility or mechanical upgrades, so confirm the permit path before you count on keeping the existing rooms as they are.
- Electrical capacity. Compare the panel with your equipment list: ovens, fryers, espresso machines, a dish machine and refrigeration. A new concept can need more power than the one before it, even in the same kind of space.
- Gas. Check the pipe size and route against your equipment. Extending gas to a new cook line, or adding equipment the old piping wasn’t sized for, is new work.
Our pre-lease walkthrough guide lists the same checks for every kind of commercial space, with what each answer means for the budget.
Leftover equipment: keep it, or start fresh?
Walk-in coolers, bar millwork, sinks and stainless tables often come with a second-generation space. Before you plan around them, confirm in the lease who owns them and who is responsible for removing them if you don’t want them. Then judge them the way you would judge a used car: condition, age, whether they suit your menu and, above all, whether they are in the right place. Keeping a walk-in that blocks the dish pit you need can cost more over the life of the lease than replacing it during the build. Lease terms themselves should be reviewed by your lawyer or leasing advisor.
What QUAY has built at both ends
Starting from nothing: a food production space in Delta. For NutJar on Annacis Island, QUAY turned an empty warehouse unit with none of the plumbing a food space depends on into a working production floor. We saw-cut the slab for new under-slab drain and water lines, re-poured the trenches and finished the floor with a liquid membrane. Our plumbing partner installed a three-compartment stainless sink, hand sinks on a new pony wall, a mop sink, a grease trap, a gas line, an exhaust vent and a hot water tank under a City of Delta plumbing permit. The work took about two weeks on site, and QUAY’s estimate to complete the same scope today is $30K to $35K + GST. It’s a small project, but it shows the work a first-generation space needs before any kitchen equipment goes in.
Transforming an existing unit: a Downtown Vancouver restaurant. For a Downtown Vancouver restaurant tenant improvement, QUAY transformed an existing commercial unit into a restaurant with custom dining areas, curved architectural details, integrated millwork and layered lighting. Because the unit was inside an occupied building, the work needed organized access, controlled deliveries, protection of shared areas and careful sequencing of trades around the opening schedule. Building rules like these come with most existing spaces, first or second generation, and are planned and priced in from the start.

Pre-lease checklist for a second-generation space
Take this list on your walkthrough, ideally with your contractor, before you sign.
- Confirm with the City that a restaurant or café use is allowed in the unit, and whether a development permit may be needed.
- List what the last tenant left: hood, make-up air, interceptor, drains, sinks, washrooms, gas, walk-in, millwork.
- Ask for service, cleaning and pump-out records for the hood, fire suppression system and grease interceptor.
- Measure the hood against your planned cook line and check the exhaust route.
- Size the grease interceptor from your own fixture list, not the previous tenant’s.
- Compare the electrical panel with your equipment list.
- Check washroom count and condition, and whether your planned work could trigger upgrades.
- Read the lease for who owns the leftover equipment and who removes what you don’t want.
- Get a construction budget for this unit to compare against the rent and any tenant improvement allowance.
- Build the VCH plan review, City permits and business licence into your opening date.
For the full sequence from lease to opening day, see opening a restaurant in Vancouver.
Second-generation restaurant space: FAQ
Is a second-generation restaurant space cheaper to build out?
Often, but only when the existing systems suit your menu and layout and are in working condition. A café that takes over a former café, with usable plumbing and exhaust, sits toward the low end of QUAY’s $180 to $260 per square foot planning range. If the hood, interceptor or drains are in the wrong place or too small, much of that saving disappears.
Can I use the previous restaurant’s health permit?
No. Vancouver Coastal Health says the annual food service permit is not transferable to a new owner, so a new operator needs its own approval and inspection, even in a space that was already a restaurant.
Do I need Vancouver Coastal Health approval if I keep the existing kitchen?
If you are renovating or altering the premises, yes. VCH says floor plans must be reviewed and approved before construction begins, for new premises, renovations and facilities that need alterations to meet current requirements.
Will the existing grease interceptor be big enough?
It depends on your fixtures. Metro Vancouver Bylaw 365 requires a correctly sized grease interceptor connected to all required fixtures, so size it from your own fixture list. Metro Vancouver’s sizing tool works from that list.
How long does a restaurant build-out take?
Most QUAY restaurant and café builds take 8 to 12 weeks of construction once permits are in place and materials are ordered. Reusing suitable exhaust and grease systems can shorten the work; design, permits and the health plan review come first and are scheduled separately.
Ready to get started?
Tell us about the space you are looking at and your concept, and we will walk the unit with you and give you a construction budget to test the lease against.
Book a discovery callRelated guides
- Opening a Restaurant in Vancouver: Permits, Health Approval and Build-Out Timeline: every approval and step from lease to opening day.
- Commercial Kitchen Requirements in BC: Health Approval, Sinks, Grease Interceptors and Finishes: what the kitchen itself has to include.
- What to Check Before You Sign a Commercial Lease: A Contractor’s Walkthrough: the pre-lease checks for any commercial space.