How to Choose a Commercial Renovation Contractor in Vancouver: A Vetting Checklist
By QUAY Construction · November 24, 2026 · Commercial
Quick answer: Choose a commercial renovation contractor on evidence, not on the lowest number. Before you compare prices, confirm five things: the company is insured and in good standing with WorkSafeBC (ask for a clearance letter); it has built your type of space and can show the scope, schedule and cost of a comparable project; it can work after hours and inside your building’s rules; its proposal is fixed-price and lists inclusions, exclusions and allowances; and it will coordinate permits and landlord approvals. As a yardstick, QUAY’s recent commercial projects took two to eight weeks of construction, and most commercial renovations in Vancouver cost about $90 to $400+ per square foot (2026 ranges, before GST, design fees, permits and equipment).
A commercial renovation is different from a home project. Rent is usually running before you open, the building has rules about noise, deliveries and elevators, and a landlord has to approve the work. The checklist below is what we would want a business owner to ask us, and what a good answer sounds like. It is written from our own work as a commercial renovation contractor in Vancouver, using real projects and published numbers as examples, and you can check every range against our commercial renovation cost guide.
The vetting checklist at a glance
| What to check | How to check it | What a good answer looks like |
|---|---|---|
| Insurance and WorkSafeBC | Ask for a certificate of insurance and a WorkSafeBC clearance letter | Both supplied before work starts, and the certificate meets your landlord’s requirements |
| Licensed trades | Ask who does the electrical and gas work and look them up with Technical Safety BC | Named trade contractors you can verify |
| Comparable projects | Ask for two or three projects like yours | Specific spaces with scope, schedule and contract value, not just photos |
| Occupied-building work | Ask how they handle noise, dust, after-hours work and elevator bookings | A plan for your building: hours, phasing, protection and who books what |
| The proposal | Compare scope, inclusions, exclusions and allowances line by line | A fixed price, with allowances listed separately and every exclusion written down |
| Changes | Ask how extra work is priced and approved | No extra work without your written approval of scope and cost |
| Permits and approvals | Ask who prepares drawings, permit applications and the landlord submission | A written split of responsibilities |
| Schedule | Ask for a schedule showing long-lead items and inspections | Long-lead items ordered as soon as the design is approved |
| Warranty | Ask what is covered and for how long | A written workmanship warranty (QUAY’s is 365 days), separate from manufacturer warranties |
Insurance, WorkSafeBC and licensed trades
Start with the paperwork, because it protects you even when everything else goes well. Ask for a certificate of insurance. Landlords and property managers often ask for insurance, drawings, deposits, a work schedule and contractor documents before work can start, so a contractor who works in commercial buildings regularly will have these ready.
Then ask for a WorkSafeBC clearance letter. WorkSafeBC says it is critical to know whether a business or contractor you plan to hire is registered and in good standing, and warns that if a contractor you hire isn’t paying its premiums, you could be liable for premiums relating to the work they did for you. Its advice is to get a clearance letter before and after you receive the services (WorkSafeBC: Why do I need a clearance letter?).
Electrical and gas work is regulated work in BC. Ask which electrical and gas contractors will work on your project and look them up in Technical Safety BC’s licensed contractor search. Ask, too, whether the company holds the business licence your municipality requires.
For reference, QUAY is a licensed and insured general contractor at 928 Homer St in Vancouver, maintains WorkSafeBC coverage, and has completed 500+ residential and commercial projects since 2019.
Experience with your type of space
A contractor who builds good offices is not automatically ready for a café or a clinic. The trades, approvals and risks change with the use of the space:
- Restaurants and cafés bring City permits, Vancouver Coastal Health approval of plans and premises, and Metro Vancouver’s grease interceptor rules into the schedule. See our restaurant and café renovations and our guide to commercial kitchen requirements in BC.
- Medical and dental clinics add health authority and equipment requirements. At our False Creek health clinic, Vancouver Coastal Health requirements meant hand sinks in the treatment rooms, and every new drain started with scanning and coring the concrete slab. See medical clinic renovations and dental clinic renovations.
- Retail stores turn on the storefront, display millwork, lighting and landlord or shopping-centre procedures. See retail renovations.
- Offices depend on data and power to workstations, ceiling, sprinkler and HVAC changes, and keeping staff working. See office renovations.
- Tenant improvements add lease work schedules and landlord approvals to the permits. See tenant improvements.
Ask for two or three comparable projects with the scope, the schedule and the contract value, and ask what was difficult and how it was handled. Photos alone don’t tell you whether a contractor can work to your opening date. Our commercial project pages publish all three: the Five Star office and warehouse in Burnaby ($175K–$250K + GST, about eight weeks), the Top Drawers retail store downtown ($75K–$100K + GST, about a month) and the NutJar food production warehouse in Delta ($30K–$35K + GST in today’s cost, about two weeks).

Working in an occupied building
Most commercial renovations happen in buildings that stay open: neighbouring tenants, a property manager or strata, shared elevators and loading areas, and often your own staff and customers. Many commercial and mixed-use buildings limit noisy work to set hours and require elevator bookings and common-area protection. A good contractor plans and prices that from the start instead of discovering it in week two.
Ask how they would handle your building specifically: which work happens after hours, how dust and noise are contained, who books the elevator and deliveries, and how the building manager is kept informed. Good answers are concrete. At the Fairview chiropractic office, all of the work was done after hours and on weekends, and the renovation took two weeks. At the False Creek clinic, the concrete coring was scheduled on weekends. If you own or manage the building, see how we work with landlords and property managers.
Reading the proposal: fixed price, allowances and exclusions
Two prices are only comparable when the scope behind them is the same. Lay the proposals side by side and check four things:
- Inclusions: demolition, framing, drywall, ceilings, flooring, painting, electrical and lighting, plumbing, heating and ventilation changes, millwork and finishes, as each applies to your space.
- Exclusions: commercial construction prices commonly leave out design and engineering fees, permit fees, furniture, IT and AV, signage, specialty equipment and GST. That is normal, as long as it is written down so you can budget for it.
- Allowances: items not yet selected, such as custom millwork, feature lighting or premium flooring, carried as a set amount. A low allowance makes a proposal look cheaper than the project will be.
- Assumptions: what the contractor assumed about the existing ceilings, mechanical systems, electrical capacity, access and working hours.
Then ask how changes work. QUAY prices every commercial project from a site visit and your drawings or brief, and the fixed-price proposal lists the scope, inclusions, exclusions and allowances. Additional work is never charged without your written approval. If a contractor can’t explain how a change is priced and approved, expect disagreements later.
To sanity-check the total, our commercial service pages and cost guide publish 2026 planning ranges for construction: about $90 to $250 per square foot for offices, $100 to $220 for retail stores, $180 to $260 for cafés, $180 to $300 for medical clinics, $220 to $400 for dental clinics and $250 to $400+ for full-service restaurants, before GST, design fees, permits and equipment.
Permits, drawings and landlord approvals
Work that changes walls, plumbing, electrical, ventilation or the use of a space often needs permits, and in a leased unit the landlord usually approves the drawings first. Ask each contractor to put in writing who does what: who prepares the drawings, who engages engineers if they are needed, who applies for building and trade permits, who books inspections and who handles the landlord submission. When nobody owns a step, the schedule slips before construction has even started.
A design-build contractor can take on design, permits and construction under one contract, which is how QUAY runs commercial design-build projects. If you already have a designer, the contractor should still review the drawings for buildability and price them before you commit. Our commercial permits page explains how we confirm the permit path, and our guides to the tenant improvement process and what to check before signing a commercial lease cover the steps around it.

Schedule and who you will deal with
Rent often starts before you open, so every week of construction can be a week of rent without revenue. Ask for a schedule that shows design and permits, long-lead items, construction and inspections, and ask when long-lead items will be ordered. Kitchen equipment, exhaust hoods, rooftop mechanical units, clinical cabinetry, storefront glazing and custom millwork often have the longest lead times.
Check the construction time against real projects. QUAY’s recent commercial projects took two to eight weeks of construction: the Fairview chiropractic office two weeks, the Delta warehouse demising wall about three weeks, the False Creek health clinic four weeks and the Five Star office and warehouse about eight weeks. Restaurants and retail stores typically need eight to twelve weeks of construction once permits are in place, and medical clinics four to eight weeks.
Ask who your day-to-day contact will be. On QUAY’s commercial work, a single project manager runs each job and coordinates the trades, tenants and building management.
Payment terms and the 10% holdback
In BC, the Builders Lien Act requires the person primarily liable on a contract under which a lien may arise to retain a holdback equal to 10% of the greater of the value of the work provided and the payments made (section 4). Subject to exceptions, an owner must also set up a holdback account for each such contract (section 5). The holdback period ends 55 days after a certificate of completion is issued or, without one, 55 days after the contract or the work is completed (section 8).
In practice, your payment schedule should show the holdback, and a contractor should be comfortable with it. Ask what deposit is required, how progress payments are tied to completed work and when the holdback is released. This is general information, not legal advice: for a large project, or a lease with complex construction terms, have a lawyer review the contract.
Red flags to walk away from
- No certificate of insurance or WorkSafeBC clearance letter, or a promise to send them later.
- A one-line price with no inclusions, exclusions or allowances.
- A much lower number that leaves out work the other proposals include.
- Pressure to skip permits or to start before the landlord has approved the drawings.
- No comparable commercial projects, or none with a schedule and cost they will share.
- No written process for pricing and approving changes.
- Large payments well ahead of the work, or resistance to the holdback.
- Vague answers about who manages the job day to day.
Questions to ask before you sign
- Can you send a certificate of insurance and a WorkSafeBC clearance letter? Good answer: yes, before work starts, with the certificate set up the way your landlord asks.
- Which projects like ours have you built, and what did they cost and how long did they take? Good answer: named spaces with contract values and construction weeks.
- Who will do the electrical, plumbing, gas and mechanical work? Good answer: named trade contractors you can verify.
- How will you work in our building? Good answer: specific hours, phasing, dust and noise control, deliveries and elevator bookings.
- What exactly is included, excluded and carried as an allowance? Good answer: a written list for each.
- How are changes priced and approved? Good answer: nothing proceeds without your written approval of scope and cost.
- Who prepares the drawings, permits and landlord submission? Good answer: a clear split, in writing.
- What is the schedule, and when will long-lead items be ordered? Good answer: a dated schedule, with orders placed as soon as the design is approved.
- Who is our day-to-day contact? Good answer: one named project manager.
- What warranty do you give, and what does it cover? Good answer: a written workmanship warranty, separate from manufacturer warranties.
Renovating a home instead? The same thinking applies, with different trades and approvals: see our questions to ask a kitchen contractor and questions to ask a bathroom contractor.
Choosing a commercial contractor: FAQ
Should I always choose the lowest bid?
Not on price alone. Compare proposals on the same scope, inclusions, exclusions and allowances first. A lower number often leaves out work the others included, and those items come back as changes during construction.
What is a WorkSafeBC clearance letter, and do I need one?
It confirms that a business is registered with WorkSafeBC and in good standing. WorkSafeBC warns that if a contractor you hire isn’t paying its premiums, you could be liable for premiums relating to the work, and advises getting a clearance letter before and after the work.
Can my business stay open during the renovation?
Often, yes. Noisy and dusty work can be scheduled after hours and on weekends, and the work phased so part of the space stays in use. QUAY renovated a Fairview chiropractic office in two weeks with all of the work done after hours and on weekends.
How long does a commercial renovation take?
QUAY’s recent commercial projects took two to eight weeks of construction. Restaurants and retail stores typically need eight to twelve weeks once permits are in place, and medical clinics four to eight weeks. Design, permits and approvals come first and are scheduled separately.
What is the 10% holdback?
Under BC’s Builders Lien Act, the person primarily liable on a contract under which a lien may arise must retain a holdback of 10% of the greater of the value of the work provided and the payments made. The holdback period ends 55 days after a certificate of completion is issued or, without one, 55 days after the contract or the work is completed.
Ready to get started?
Tell us about your space, your lease dates and what your business needs, and we will walk you through how we would price, schedule and build it.
Book a discovery callRelated guides
- What to Check Before You Sign a Commercial Lease: A Contractor’s Walkthrough: the checks to make before you commit to a space.
- The Tenant Improvement Process: Lease to Opening, Step by Step: what happens once you have chosen a contractor.
- Opening a Restaurant in Vancouver: Permits, Health Approval and Build-Out Timeline: the extra approvals for food businesses.