Every office renovation is different, but the good ones follow the same sequence. Knowing the steps helps you plan your lease dates, your budget and your team’s move. This guide walks through the seven steps QUAY follows, with typical timelines. To talk about your project, see our office renovations in Vancouver page.

Step 1: Discovery

We start with how your team works and what the office needs to do: private offices, meeting rooms, collaboration space, a kitchen, storage and technology. We also discuss the property, lease timing, design status and your budget range.

Step 2: Site visit and existing conditions

We walk the space and look at what is already there: walls, ceilings, lighting, electrical capacity, heating and ventilation, washrooms and the building’s rules for access, deliveries and working hours. These conditions shape what can be built and what it costs.

Step 3: Design and scope

Layouts, finishes, lighting, power and data are developed together, either from your designer’s drawings or through our design-build process. Long-lead items such as custom millwork are identified early.

Step 4: Fixed-price proposal

Before construction, you receive a detailed fixed-price proposal with the scope, inclusions, exclusions and allowances. For budgeting before this stage, see office renovation costs in Vancouver: about $90 to $150 per square foot for a refresh and $150 to $250 for a full build-out in 2026.

Step 5: Permits and building approvals

Work that changes walls, plumbing, electrical or ventilation often needs a permit. In Vancouver, office tenants in eligible buildings can use the City’s Tenant Improvement Program, which the City says gives complete applications an initial review and contact within 5 to 10 business days. Your landlord or property manager may also need plans, insurance and a work schedule. See our office permits guide.

Step 6: Construction

Demolition, framing, rough-ins for electrical, data and mechanical, inspections, drywall, ceilings, flooring, painting and millwork follow one coordinated schedule. A small office typically takes 4 to 6 weeks of construction once permits are in place and materials are ordered.

If your team needs to keep working, noisy and dusty work can be scheduled after hours and on weekends and the office phased so part of it stays in use. We renovated a Fairview chiropractic office in two weeks this way.

Step 7: Inspections, deficiencies and move-in

Final inspections, a deficiency walk-through and closeout documents come last, so you can move in with everything signed off. Applicable work is then covered by QUAY’s 365-day workmanship warranty.

How long the whole process takes

Construction is usually the shortest part. Design, permits and landlord approvals come first, and their length depends on the scope, the building and the City. The earlier the design and permit path are settled, the sooner construction dates can be locked in. Read more in how long an office renovation takes.

Leasing a new office?

If you are moving into a leased unit, the project is also a tenant improvement. Read tenant improvements vs office renovations and how tenant improvement allowances work.

How QUAY prices and delivers the work

Every QUAY project starts with a site visit and your drawings or brief. You then get a detailed fixed-price proposal that lists the scope, inclusions, exclusions and allowances, agreed before construction begins. One project manager is your point of contact from approval to handover, noisy work can be scheduled after hours and on weekends, and applicable work is covered by our 365-day workmanship warranty. Learn more about our process.