- Kitchen
Kitchen Renovation Checklist: 12 Steps in the Right Order
- By QUAY Construction
A kitchen renovation goes smoothly when the decisions are made in the right order: what you want to fix, how much of the kitchen you are changing, the budget, the layout, the cabinets and surfaces, the appliances, the lighting and power, the approvals, and only then the construction. This checklist puts those decisions in that order, so nothing that affects the cabinets or the plumbing is still undecided when the old kitchen comes out. It is the same sequence we follow on our kitchen renovation service in Vancouver: plan before demolition, set the scope in a detailed proposal, coordinate every trade through one team, and finish every detail before handover.
Quick answer. Work through the 12 steps below before construction starts. Most complete Vancouver kitchens with QUAY fall in a $40,000 to $80,000+ planning range, and most standard kitchens take about 15 working days on site once the design is final, materials are on hand and any permits or strata approvals are in place.
The kitchen renovation checklist at a glance
- Write down what the new kitchen has to fix
- Decide between a partial update and a full renovation
- Set a working budget
- Measure the room and settle the layout
- Choose cabinets: keep, reface or replace
- Choose countertops and backsplash
- Pick appliances before the cabinets are drawn
- Plan lighting, power and ventilation
- Check permits and, in a condo, strata approval
- Get a fixed-price proposal
- Order long-lead items before demolition
- Prepare for the on-site work and the final walk-through

Step 1: Write down what the new kitchen has to fix
Start with the problems, not the finishes. A short list keeps every later decision honest:
- What frustrates you about the kitchen today: storage, counter space, traffic, light, dated finishes?
- How do you use it: everyday cooking, baking, hosting, children doing homework at the island?
- Who uses it at the same time, and where do they get in each other’s way?
- Are you planning to sell in the next few years, or is this the kitchen you will live with for a long time?
Step 2: Decide between a partial update and a full renovation
If the layout works and the cabinet boxes are sound, a partial update can solve most of the list for a fraction of the cost. Our Moodyville partial kitchen in North Vancouver got new lower cabinet fronts, white quartz, a slab backsplash and new lighting for $24,000 to $28,000, in 10 days on site. If you want to move the sink, the range or walls, or the cabinets are failing, you are in full renovation territory. Our guide to partial vs full kitchen renovations walks through the trade-offs.
Step 3: Set a working budget
Use published numbers, then adjust for your scope. QUAY’s kitchen renovation cost guide puts most complete Vancouver kitchens in a $40,000 to $80,000+ planning range, complete condo kitchens commonly around $40,000 to $75,000+, and larger, premium or highly customized kitchens above $100,000. Custom cabinetry, premium appliances, significant layout changes and luxury materials are what push a kitchen up the range. To see where real projects landed, compare what ten QUAY kitchens cost, and for condos see our condo kitchen cost guide.
Decide now which items you will choose yourself (appliances, light fixtures, hardware) and which you want included, because that changes what the budget has to cover.
Step 4: Measure the room and settle the layout
The layout decides almost everything that follows: where the plumbing and gas go, how many cabinets you need, and whether a wall has to come out. Settle it before choosing finishes.
- Measure walls, windows, doors, ceiling height and the location of the sink, range and fridge.
- Decide whether the sink, range or fridge will move. Moving them adds plumbing, gas or electrical work, and may add a permit.
- If you want an island, check that it fits with comfortable walkways around it. Our kitchen island size guide covers sizes and clearances.
- If the plan opens the kitchen to another room, find out early whether the wall is load-bearing. See load-bearing wall removal for open-concept kitchens.
For layout options, see our Vancouver kitchen layouts guide. If you are deciding who should draw the plan, our comparison of a kitchen designer vs design-build explains the two routes.
Step 5: Choose cabinets: keep, reface or replace
Cabinets are usually the largest single item in a kitchen budget, so make this decision deliberately. Sound boxes in a layout you are keeping can often be refaced; boxes with water damage or a layout that is changing usually mean new cabinets. Our guide on whether kitchen cabinets can be saved sets out how to tell, and kitchen cabinet door styles helps once you are choosing fronts. Settle internal storage (drawers, pull-outs, pantry, tall units) at the same time; it is far harder to change after the cabinets are ordered.
Step 6: Choose countertops and backsplash
Pick the countertop material once the cabinet layout is set, since edge details, sink type and any waterfall ends depend on it. Our comparison of quartz vs granite countertops covers the two most common choices. Decide whether the backsplash will be tile or a slab of the counter material at the same time, because a full-height slab backsplash changes outlet and switch positions.

Step 7: Pick appliances before the cabinets are drawn
Cabinets are built around appliance dimensions, so choose models, not just brands, before the cabinet drawings are final. Panel-ready fridges and dishwashers, wall ovens, a rangetop in an island and a built-in microwave each need specific cabinet openings and power. Our guide to kitchen appliance brands for every budget can help you narrow the list.
Step 8: Plan lighting, power and ventilation
- Lighting. Plan general, task (under-cabinet) and decorative lighting together, along with switch locations.
- Power. List appliance circuits and counter outlets, including any in an island.
- Ventilation. Choose the range hood with the range. A powerful hood can bring its own requirements; see our article on range hood venting and CFM.
These go into the plan before construction, because rough-ins happen right after demolition and before the cabinets go in.
Step 9: Check permits and, in a condo, strata approval
Whether you need a permit depends on the work and on your city. Moving plumbing, walls, electrical or gas are the changes most likely to need one. Our guide to which renovations need a permit in Vancouver explains the City of Vancouver rules, and if you live in Coquitlam see our Coquitlam kitchen permit guide.
In a condo, the strata’s bylaws and approval process come first. Expect to submit a renovation application and to follow the building’s rules for work hours, deliveries, elevator bookings and flooring underlay. Our guide to condo kitchen strata rules and approvals covers what to ask for, and condo flooring and acoustic underlay rules covers the flooring side.
Step 10: Get a fixed-price proposal
Before construction, ask for a written proposal that sets out the scope, the price, what is included and excluded, any allowances for items still to be chosen, and who is responsible for what. With QUAY, you get a detailed fixed-price proposal before construction starts, and completed work is backed by a 365-day workmanship warranty. Compare proposals line by line, not just on the total: a lower number that leaves out the electrical, the backsplash or the disposal of the old kitchen is not a lower price. To compare the contractors themselves, use our questions to ask a kitchen contractor before you hire, which shows what a good answer looks like for each one.
Step 11: Order long-lead items before demolition
Cabinets, countertops and fixtures are ordered once the design is approved, so they are on hand before the old kitchen comes out. This is the single biggest thing you can do to keep your home without a kitchen for as short a time as possible. Our kitchen renovation timeline guide explains what comes before construction and what can stretch a schedule.
Step 12: Prepare for the on-site work and the final walk-through
Most standard kitchens take about 15 working days on site. On real QUAY kitchens, the Moodyville partial update took 10 days, a full kitchen renovation in Dunbar took about three weeks, and the fully custom Shaughnessy kitchen with a dry bar took three weeks, with a budget of $70,000 to $80,000. Before work starts:
- Set up a temporary kitchen elsewhere in the home: a fridge, a microwave or hot plate, and a place to wash up.
- Empty the cabinets and clear the route the crew will use.
- Agree on working hours, parking and, in a condo, the elevator and loading bookings.
- Know the order of work: protection and demolition, plumbing and electrical rough-ins, cabinets, countertops and backsplash, then connections, touch-ups and cleaning.
At the end, walk through the finished kitchen with your contractor, list any deficiencies, and keep the warranty and product documents together.
Ready to start your checklist with a contractor? Book a discovery call. Tell us about your kitchen and what it has to fix, and we’ll walk the space and give you a detailed fixed-price proposal.
Frequently asked questions
What is the correct order for a kitchen renovation?
Decide what the kitchen has to fix, choose partial or full, set the budget, settle the layout, then choose cabinets, countertops, appliances, lighting and power. Confirm permits and any strata approval, get a fixed-price proposal and order long-lead items. On site, the work runs from protection and demolition to rough-ins, cabinets, countertops and backsplash, then connections and finishing.
How long does a kitchen renovation take?
Most standard kitchens with QUAY take about 15 working days on site, once the design is final, materials are on hand and any permits or strata approvals are in place. Design, ordering and approvals happen before that.
How much should I budget for a kitchen renovation in Vancouver?
Most complete Vancouver kitchens with QUAY fall in a $40,000 to $80,000+ planning range. Complete condo kitchens commonly run about $40,000 to $75,000+, and larger, premium or highly customized kitchens can exceed $100,000. A partial update can cost less: QUAY’s Moodyville partial kitchen was $24,000 to $28,000.
Should I choose appliances before cabinets?
Yes. Cabinets are built around appliance dimensions, so choose the actual models, including any panel-ready or built-in units, before the cabinet drawings are final.
Planning a Kitchen Renovation?