QUAY Construction

Zero-threshold shower floor sloped to a drain, with continuous marble-look tile, in a Shaughnessy accessible bathroom

Curbless (Zero-Entry) Showers: What It Takes to Build One in a House or Condo

Quick answer: A curbless shower has no step at the entry: the bathroom floor carries straight into the shower and slopes gently to a drain, so the shower area has to sit lower than the rest of the floor. Building one means recessing the floor under the shower or raising the floor around it, waterproofing the whole wet area as one system and planning the drain before demolition. QUAY built one in a Shaughnessy townhouse as part of a new ground-floor bathroom that came in at about $42,000 including drawings, the City of Vancouver building permit and strata approval.

Curbless showers look simple because there is nothing to see: no curb, no tray edge, one tile running wall to wall. That simplicity is the hard part. Whether your floor can take one is decided by what is under it, and our walk-in shower installation service in Vancouver starts with exactly that question at the on-site consultation.

This guide explains what has to happen under the tile, how the approach differs in a wood-framed house and a concrete condo, how drains and glass change, and what the strata and permit side looks like. It is the build-side companion to our aging in place bathroom checklist, which covers grab bars, seating and tax credits.

What a curbless shower is

A curbless shower is a walk-in shower with no curb, step or tray edge at the entry. You will also see it called a zero-entry, zero-threshold, level-entry, barrier-free or roll-in shower. The names overlap; what they share is that you can walk, or roll a shower chair or wheelchair, straight in.

A low-curb shower is the halfway option: a short curb, lower than a tub wall, that still contains water but is a small step. Our walk-in showers are built with minimal or zero thresholds depending on what the floor allows, and low-curb is the usual answer when the floor cannot be lowered.

Curbless (zero-entry)Low-curbStandard curb or tray
Step at entryNoneSmallYes
Floor workShower area lowered or surrounding floor raisedUsually built on the existing floorBuilt on the existing floor
Water containmentSlope, drain position and glass do all the workCurb helpsCurb or tray edge holds water
WaterproofingWhole wet area, often the full bathroom floorShower walls and baseShower walls and base
Best forAging in place, mobility aids, a seamless lookMost renovations where the floor cannot be loweredBudget-led projects, simple replacements

The real work is in the floor

Every shower floor has to slope to its drain. With a curb, that slope can start at the curb and stay above the bathroom floor. Without one, the shower floor has to start at the bathroom floor level and drop from there, so the drain ends up lower than the floor outside the shower.

That drop has to come from somewhere. Depending on the system, there is a mortar bed or foam tray for the slope, a waterproofing membrane, tile setting material and the tile itself. The drain body and trap also need depth below the finished floor. If the existing floor build-up is thin, there is no room for all of that without changing the structure or the floor levels.

This is why a curbless shower is decided at the design stage, not on site. Before demolition we check the floor structure, where the drain can go, which way the joists run (in a house) or what the slab allows (in a condo), and how the new floor levels meet the bathroom door.

Cross-section diagram comparing three ways to build a curbless shower: recessing the floor, raising the surrounding floor, and a low-curb fallbackA. Recess the shower areaFloor structure lowered under the shower;tile runs level into a sloped base.B. Raise the floor around itWhole bathroom floor built up;a transition is needed at the door.C. Low-curb fallbackFloor stays as it is; a short curbholds water. Small step at entry.Sloped shower baseFloor build-up and tileStructure (joists or slab)Curb
Simplified, not to scale. The depth each approach needs depends on the base, membrane, drain and tile system chosen.

Three ways to build the slope

1. Recess the floor under the shower

The cleanest result: the shower area is lowered so the finished tile is level everywhere else and drops only inside the shower. In a wood-framed house this means working with the floor framing under the shower, which is a structural detail to plan, not something to improvise once the floor is open. Where joists cannot be altered, the framing around the shower area is reworked so the base can sit lower. In a concrete building, recessing means cutting into the slab, which is rarely the easy option (see the condo section below).

2. Raise the floor around the shower

If the shower cannot go down, the rest of the bathroom can come up. The whole floor is built up to meet the top of the sloped shower base, so there is still no step into the shower. The trade-off moves to the bathroom door: the raised floor meets the hallway at a higher level, so the transition needs planning, and the door and trim may need adjusting. For someone using a walker or wheelchair, that threshold matters as much as the shower entry.

3. Use a thin, pre-sloped base

Pre-sloped foam shower trays and bonded waterproofing systems are thinner than a traditional mortar bed, which can make the difference in a floor with little depth to spare. Our Coquitlam tub-to-shower conversion was built on a custom tile-ready Schluter base; whether a thin system is enough for a fully curbless entry depends on the drain, the tray and the floor it sits on. If none of the three works, a low-curb shower is the honest fallback, and it still removes the high step of a tub.

Curbless in a house vs a condo

Houses and townhouses with wood framing usually give you more options, because the floor structure can be reworked and the drain lines can usually be reached from below. Our Shaughnessy accessible bathroom project is a townhouse example: a closet was turned into a new ground-floor bathroom built around a custom tiled shower base about three by five feet, sloped to the drain so the floor tile runs straight into the shower with no curb, behind a frameless glass door. Because it was a new bathroom, QUAY prepared drawings, applied for the City of Vancouver building permit and handled the strata approval before work started.

Condos over concrete are tighter. The slab is part of the building’s structure, and the drain often has to connect to a shared stack in a fixed spot. Under the Strata Property Act’s Standard Bylaws, an owner needs the strata corporation’s written approval before altering a strata lot in a way that involves the structure of the building or common property, and many stratas have their own renovation bylaws on top of that (see the Standard Bylaws, sections 5 and 6). In practice, condo curbless showers usually rely on raising the bathroom floor or a thin base system rather than cutting the slab, and some condo bathrooms are better served by a low-curb shower.

Our West End condo bathrooms show the condo approach: the ensuite tub came out for a walk-in shower on a custom base sloped to a linear drain along the entry, so the floor tile runs straight into the shower, with Dense-Shield board and a waterproofing membrane behind marble-look porcelain. QUAY prepared the strata renovation request, supplied our insurance certificate and a WorkSafeBC clearance, and the strata council approved the work before construction. For more on how stacks and strata rules shape a condo bathroom, read our guide to condo bathroom renovation cost, strata and stacks.

Walk-in shower with a linear drain, marble-look porcelain walls and terrazzo-look floor tile in a West End condo ensuite

Linear drain or centre drain

A round centre drain makes the floor slope in four directions, like a shallow funnel. That works, but it forces small tiles or many cuts, and the low point sits in the middle of the shower. A linear drain is a long, narrow channel, usually along the entry or the back wall, so the floor slopes in one direction. That makes large-format tile easier to use and, when the drain sits at the entry, it catches water right where a curb would have been.

Both can work in a curbless shower. The linear drain is the more common choice when the bathroom floor and shower floor are meant to read as one surface. A square drain on a custom sloped base, which we used in the West End main bathroom and a West Vancouver ensuite addition, can also suit a curbless layout when the room and tile allow. Our guide to walk-in shower ideas for small bathrooms shows how different drains look in real QUAY showers.

Moving a drain is plumbing work. The City of Vancouver requires a permit to install, change or upgrade any part of a plumbing system, while repairing or replacing fixtures in the same location does not need one (City of Vancouver plumbing permits). Our post on bathroom permits in Vancouver covers which bathroom jobs need which permit.

Waterproofing the whole wet area

With a curb, water is held inside the shower and the waterproofing can stop at the curb. Without one, water can and will reach the bathroom floor outside the glass, especially when someone showers seated or a caregiver helps. So in a curbless bathroom, the waterproofing is planned for the whole wet area, and often the whole bathroom floor, as one continuous system tied into the shower walls and the drain.

Tile and grout are not waterproof on their own. We install a membrane system across the shower walls and base, following the manufacturer’s method, before any tile is set, and you are welcome to see the waterproofing before it is covered. The manufacturer’s instructions also set the details that matter most here: the minimum slope, how the membrane connects to the drain, and how seams and corners are sealed. If you are comparing systems, our shower waterproofing systems comparison walks through the common ones.

Frameless glass door on a curbless walk-in shower with marble-look tile in a new Shaughnessy bathroom

Glass, size and keeping water in

A curbless shower has no edge to stop water, so three things do the job instead: the slope, where the drain sits and how the shower is enclosed.

  • Size. A deeper shower keeps the spray further from the entry. If there will be a seat or shower chair, plan room for it and, where needed, for a caregiver standing outside the spray. The Shaughnessy shower base is about three by five feet.
  • Shower head position. Aim the spray away from the opening. A hand shower on a slide bar, as in the Shaughnessy bathroom, puts water where it is needed instead of across the floor.
  • Glass. A frameless door closes the shower off; a fixed panel leaves a wide, easy opening but needs enough depth. Glass is measured after tile so it fits the finished floor, which matters on a floor with no curb to hide small differences.
  • Drain at the entry. A linear drain along the opening catches water before it leaves the shower.

How a curbless shower is built, step by step

  1. Assess the floor. At the on-site consultation we check the floor structure, the drain location and the depth available, and confirm whether curbless, low-curb or a raised floor is realistic.
  2. Design the levels. The shower size, drain type and position, slope direction, floor levels at the door and the glass are drawn together, so nothing is decided on site.
  3. Approvals. Permits where the plumbing or layout changes, and in a strata, the written approval the bylaws require before work that involves structure or common property.
  4. Demolition and inspection. The old tub or shower and floor come out, and the framing or slab is checked for water damage before anything new goes in.
  5. Structure and rough-in. The floor is recessed or built up, blocking goes into the walls for grab bars and a seat, and the drain and valve are roughed in.
  6. Base and waterproofing. The sloped base goes in and the membrane is installed across the floor and walls as one system, tied into the drain.
  7. Tile. Floor tile runs continuously from the bathroom into the shower, cut to follow the slope.
  8. Fixtures and glass. Trim, hand shower and grab bars are installed, and the glass is measured and fitted to the finished tile.
Hand shower on a slide bar beside a stainless grab bar in an accessible Shaughnessy shower

What a curbless shower costs

There is no single price for a curbless shower, because the floor work is what moves the number. QUAY bathroom renovations start from about $25,000, with most between $25,000 and $45,000+, and larger or highly customized bathrooms can exceed $60,000. Curbless showers, layout changes and new plumbing move the price most. Most QUAY bathroom renovations take about 10 working days on site; layout changes and new bathrooms take longer.

QUAY projectShowerBudget as published
Shaughnessy accessible bathroomNew bathroom built around a curbless shower on a custom tiled base sloped to the drain, frameless glass, grab bar and hand showerAbout $42,000 for the new bathroom, including drawings and permit (2023)
West End condo ensuiteTub replaced with a walk-in shower on a custom base sloped to a linear drain along the entryAbout $37K + GST for the ensuite; about four weeks on site for both bathrooms
Coquitlam bathroomAlcove tub replaced with a walk-in shower on a custom Schluter base and frameless glassAbout $26,000 before GST

Budgets cover the whole bathroom, not just the shower. You get a fixed-price proposal before construction starts, and completed work is backed by our 365-day workmanship warranty. For the full picture, see our bathroom renovation cost guide, and if you are still deciding whether to give up the tub, read walk-in shower vs tub.

Curbless showers: FAQ

What is the difference between a walk-in shower and a curbless shower?

A walk-in shower is any shower you step into without climbing over a tub wall; it can still have a curb. A curbless shower is a walk-in shower with no curb at all: the floor runs level into the shower and slopes to the drain, so there is no step.

Can you put a curbless shower in a condo?

Often, but it depends on the slab, where the drain connects and the strata. Cutting into a concrete slab involves the building’s structure, which needs the strata’s written approval under the Standard Bylaws, so condo curbless showers usually rely on a raised bathroom floor or a thin base system. Where neither works, a low-curb shower is the fallback.

Do curbless showers leak onto the bathroom floor?

Water can reach the floor outside the shower, which is why the whole wet area is waterproofed as one system. Shower size, a drain at the entry, spray direction and glass keep most water inside the shower.

Is a linear drain required for a curbless shower?

No. A centre or square drain can also work with the right slope. A linear drain lets the floor slope in one direction, which suits large tile and catches water at the entry.

How much does a curbless shower cost in Vancouver?

It depends on the floor work. QUAY bathroom renovations start from about $25,000, with most between $25,000 and $45,000+, and curbless showers are one of the things that move the price most. QUAY’s Shaughnessy accessible bathroom, built around a curbless shower, came in at about $42,000 including drawings and the permit.

Ready to get started?

Tell us about your bathroom and who will use it, and we will tell you honestly whether your floor can take a curbless shower and what it would involve.

Book a discovery call

See our walk-in shower installation service