
Bathroom renovations in Vancouver, designed around daily life.
QUAY plans and delivers complete bathroom renovations, coordinating design, waterproofing, plumbing, electrical work, tile, cabinetry, fixtures and finishing through one accountable team. See a recent example: our North Vancouver bathroom renovation, with a spa ensuite, main bathroom and powder room.
Bathroom renovations in Vancouver: quick answers
Short answers to the questions we hear most.
- What does a bathroom renovation cost?
- Complete bathroom renovations usually start around $25,000. The final price depends on size, layout changes and finishes.
- What is included?
- One team handles design, waterproofing, plumbing, electrical, tile, vanities, fixtures and finishing.
- Why does waterproofing matter?
- Most bathroom problems start behind the tile. We plan waterproofing, drainage and ventilation before any finishes go in.
- How is it priced?
- You get a detailed, fixed-price proposal before construction starts. Completed work is backed by our 12-month (365-day) workmanship warranty.
Every detail connected. Every stage planned before construction.
A successful bathroom renovation depends on what sits behind the finished surfaces. Layout, waterproofing, drainage, ventilation, lighting, storage and material transitions must be coordinated before tile and fixtures are installed.
Layout, storage, fixtures, tile and lighting are resolved before construction begins.
Substrates, membranes, slopes, penetrations and transitions are planned together.
Fixtures, outlets, switches, lighting and ventilation are aligned with the final design.
Design, procurement, trades, communication and finishing remain connected from planning through handover.
Complete bathroom interiors. Built for comfort and longevity.
Renovate a powder room, ensuite, family bathroom or complete primary suite through one coordinated design-build process.
01 / Complete RenovationsFull Bathroom RenovationsLayout, waterproofing, plumbing, electrical work, cabinetry, fixtures, tile and finishing connected through one scope.
↗
02 / ShowersWalk-In ShowersCustom shower layouts, glass enclosures, waterproofing, niches, benches, controls and carefully resolved tile details.
↗
05 / AccessibilityAccessible BathroomsBarrier-free showers, supportive fixtures and improved circulation integrated without sacrificing the finished design.
↗Complete bathroom services. Explore the part of your project that matters.
Open a category to review QUAY’s bathroom renovation, design, plumbing, tile, accessibility and finishing services.

Beautiful finishes matter. Technical execution protects them.
Tile and fixtures are only the visible layer. The long-term performance of a bathroom depends on substrate preparation, waterproofing, drainage, ventilation and the coordination of every penetration through the finished assemblies.
Membranes, slopes, shower pans and drain locations planned as one complete system.
Valves, supplies, drains and fixture dimensions coordinated with the final layout.
Task lighting, ambient lighting, receptacles and exhaust systems positioned intentionally.
Edges, corners, niches, thresholds and material changes resolved before installation.

Decisions made before demolition. Construction managed in sequence.
Our process connects discovery, design, procurement and construction so fewer decisions remain unresolved once work begins.
View the Complete Process ↗
Begin with the room, the property and your priorities.
We discuss the existing bathroom, functional goals, design direction, property conditions, preferred timing and anticipated investment.
- Project goals and priorities
- Existing-room conditions
- Property and access considerations
- Timing and anticipated investment

Resolve the layout, storage, materials and lighting.
The bathroom is designed as one complete interior rather than a collection of individual product selections.
- Layout development
- Vanity and storage design
- Tile and fixture selections
- Lighting and finish coordination

Establish the work and secure the required materials.
Scope, inclusions, pricing, construction details and product lead times are documented before the renovation begins.
- Detailed project proposal
- Material procurement
- Trade and inspection planning
- Construction schedule

Complete each layer in the correct sequence.
Demolition, rough-ins, inspections, waterproofing, tile, millwork, fixtures and finishing are coordinated through one managed schedule.
- Site protection and demolition
- Plumbing and electrical rough-ins
- Waterproofing and tile
- Fixture installation and finishing

Complete the renovation with an organized handover.
The finished work is reviewed, documented and presented through a final walkthrough supported by QUAY’s workmanship warranty.
- Final walkthrough
- Deficiency review
- Project documentation
- 12-month workmanship warranty
Different rooms. The same attention to every detail.
Explore selected bathroom layouts, shower details, custom vanities, tile and accessibility improvements.
View All Projects ↗
A calm interior built from carefully resolved details.
Materials, storage and fixtures connected through one restrained and functional design.

Waterproofing and tile brought together precisely.
Shower proportions, drainage, controls, glass and tile details planned as one complete assembly.

Storage designed around the room—not added afterward.
Vanity proportions, countertop, lighting and storage developed specifically for the available space.

Long-term comfort without compromising the design.
Improved circulation and supportive features integrated quietly into a polished residential interior.
Real bathrooms. Real budgets and schedules.
Each project page shows the before and after photos, what we built, what it cost and how long it took.
All bathroom projects ↗
Yaletown · Condo · About $28K + GSTYaletown condo bathroomSee the project ↗
Yaletown · Condo with tub · About $21K + GSTYaletown condo bathroom with tubSee the project ↗
Fairview · Condo ensuite · About $47K + GSTFairview condo ensuite and closetsSee the project ↗
West End · 2 condo bathrooms · About $66K + GSTWest End condo bathroomsSee the project ↗
Gastown · 2 condo bathrooms · About $79KGastown loft condo bathroomsSee the project ↗
West Vancouver · New ensuite · About $58K + GSTWest Vancouver ensuite additionSee the project ↗
North Vancouver · 3 bathrooms · About $128KNorth Vancouver townhouse bathroomsSee the project ↗
Richmond · Condo bathroom · 2025Richmond condo bathroomSee the project ↗
Scope shapes the investment. Planning protects the finished result.
Bathroom renovation costs and timelines depend on room size, layout changes, plumbing, waterproofing, tile, cabinetry, custom details and selected materials.
Complete projects commonly include demolition, waterproofing, tile, plumbing, electrical work, cabinetry, fixtures and finishing. Final pricing depends on the approved scope.
Explore Renovation Costs ↗Custom vanities, premium tile, specialized fixtures, shower glass and architectural details influence both investment and material lead times.
Explore Renovation Resources ↗Plumbing relocation, electrical work, structural changes and significant layout modifications may require permits, documentation or inspections.
Explore Permit Guides ↗Bathroom renovation guides: Condo Bathroom Renovations
Trusted for quality and careful coordination.
“QUAY Construction completed a bathroom renovation for us. From design to demo to the finished product, we couldn’t be happier.”
Hiring a bathroom contractor? Here's what you get with QUAY.
Since 2019, QUAY has renovated homes, condos and commercial spaces for more than 500 clients across Greater Vancouver. One team designs, prices and builds your bathroom, so you deal with a single accountable contractor from the first visit to the final walkthrough instead of managing separate trades.
Comparing bathroom contractors in Vancouver? Ask each one the questions on the right. Here are our answers.
The documents most stratas and homeowners ask a contractor for before work starts.
The full scope is defined and priced first, and any change is priced and approved in writing before the work happens.
Demolition, plumbing, electrical, waterproofing, tile, glass, carpentry and painting are scheduled in the right sequence.
We prepare strata renovation requests for condos and coordinate municipal permits when the scope needs them.
If something we built needs attention in the first year, we come back and fix it.
See the recent bathroom projects above, then book a discovery call to talk through yours.
Bathroom renovations by area
QUAY completes bathroom renovations across Greater Vancouver and the Fraser Valley. Choose your area for local details.
- Bathroom renovations in North Vancouver
- Bathroom renovations in West Vancouver
- Bathroom renovations in Burnaby
- Bathroom renovations in Richmond
- Bathroom renovations in New Westminster
- Bathroom renovations in Abbotsford
Bathroom renovations in Vancouver neighbourhoods
From condo ensuites in Downtown, Yaletown, Coal Harbour and the West End to family bathrooms in Kitsilano, West Point Grey, Shaughnessy, Fairview, South Granville, Mount Pleasant and Olympic Village. Condo bathrooms are planned around strata approvals, waterproofing reviews and building work hours.
Clear answers before your renovation begins.
Learn more about bathroom costs, timelines, design, waterproofing, permits and the QUAY renovation process.
Discuss Your Project ↗Complete bathroom renovations commonly begin around $25,000. Final pricing depends on the room size, existing conditions, plumbing changes, waterproofing, tile, cabinetry, fixtures and selected materials.
Many complete bathrooms require approximately ten working days on site once planning, selections and procurement are complete. Larger bathrooms, custom work, inspections and complex layouts may require additional time.
Yes. QUAY coordinates layouts, vanities, storage, tile, countertops, fixtures, lighting and material selections through its design-build bathroom renovation process.
In many bathrooms, an existing bathtub can be replaced with a walk-in shower. Feasibility depends on available dimensions, drainage, plumbing locations, structural conditions and the desired shower configuration.
Waterproofing requirements depend on the shower or bathtub configuration and existing structure. A complete assembly may include appropriate substrates, membranes, sealed penetrations, sloped surfaces and carefully detailed transitions.
Yes. Accessible bathroom renovations may include barrier-free showers, wider circulation, supportive fixtures, non-slip flooring, accessible storage and other improvements designed around long-term comfort and mobility.
Permit requirements depend on the municipality and scope. Plumbing relocation, electrical work, structural changes and significant layout modifications may require permits or inspections.
QUAY completes a final walkthrough, deficiency review, documentation and handover. Completed construction is supported by a 12-month workmanship warranty.
Let’s discuss your bathroom.
Tell us about the room, property, renovation goals, preferred timeline and anticipated investment.