Renovation Insights & Project Guides
Costs, timelines, permits, and planning for Vancouver renovations

Featured Guide
Kitchen Renovation Cost in Vancouver (2026)
Updated for 2026, this Vancouver guide breaks down typical kitchen renovation costs, from materials and labour to permits and unexpected costs.

Commercial Kitchen Requirements in BC: Health Approval, Sinks, Grease Interceptors and Finishes
What a BC commercial kitchen must contain to pass health approval: sinks, dishwashing, a grease interceptor, finishes, ventilation and cold holding, with the rule behind each and what it means for the build.

Demising Walls: How to Split a Commercial or Warehouse Unit
What a demising wall is, when it needs a fire rating and a permit, how splitting a unit changes exits and services, and a real QUAY warehouse split in Delta.

Aging in Place Bathroom Checklist: Curbless Showers, Grab Bars and Tax Credits
A checklist for planning an aging in place bathroom: curbless showers, grab bar blocking, seating, lighting and doors, with a real Shaughnessy project and the federal and BC tax credits.

Medical Clinic Layout: Exam Rooms, Privacy and Patient Flow
How to lay out a medical clinic: the four zones, patient flow, exam room sinks and services, acoustic and visual privacy, cleanable finishes, permits and cost, with two real QUAY clinic projects in Vancouver.

Warehouse Office Build-Out: Offices, Washrooms and Mezzanines in an Industrial Unit
What goes into adding offices, washrooms and mezzanines to a warehouse or flex unit, the permits Burnaby, Delta and Richmond publish, and three real QUAY warehouse projects.

Condo Flooring in Vancouver: What Strata Allows and How Acoustic Underlay Works
What Vancouver strata bylaws require for condo flooring, IIC and STC in plain terms, how hardwood, laminate, vinyl and tile perform over acoustic underlay, and a real IIC 73 Yaletown floor.

Kitchen Renovation Ideas From 11 Real Vancouver Kitchens: Small, Condo and Family Homes
14 kitchen renovation ideas from 11 real QUAY kitchens in Vancouver and the North Shore, grouped for condos, family homes and tight budgets, with what each project cost.

Ensuite Addition Cost in West Vancouver: Permits, Timeline and a Real $58K Project
What a real West Vancouver ensuite addition cost (about $58K + GST), what it included, the District permits it needed and how long the build took.

Bathroom Renovation Ideas From 13 Real QUAY Projects
The bathroom renovation ideas that work best are the ones that fix a specific problem in a specific room: a…

Kitchen Island Size Guide: Clearances, Seating and When a Peninsula Works Better
A kitchen island needs about 42 inches of clear aisle on every side you work from (48 inches if two…

Which Renovations Need a Permit in Vancouver? A Project-by-Project Guide
Which renovations need a permit in the City of Vancouver? A project-by-project table of building, plumbing, electrical and gas permits, with real QUAY examples.

Walk-In Shower Ideas for Small Bathrooms: 9 Details From Real Vancouver Showers
Walk-in shower ideas for small bathrooms from real QUAY projects: tub-footprint layouts, curbless entries, linear drains, frameless glass and recessed niches.

Quartz vs Granite Countertops (and Porcelain): What Holds Up in a Vancouver Kitchen
Quartz vs granite vs porcelain countertops compared the way we compare them with clients: heat, stains, sealing, backsplashes, edges and cost drivers, with the materials real QUAY kitchens used.

Opening a Store in Vancouver: Build-Out Checklist From Lease to Opening Day
A build-out checklist for opening a store in Vancouver: the lease, City and sign permits, storefront, lighting, fixtures and the construction timeline, with a real QUAY store as the example.

Renovate or Rebuild? How to Decide for an Older Vancouver House
How to decide whether to renovate or rebuild an older Vancouver house: structure, R1-1 zoning, character and heritage rules, demolition requirements, and how to compare cost and time.

How Long Does a Bathroom Renovation Take? From Design to Handover
Many complete bathrooms take about ten working days on site once design, selections and materials are ready. Here is each stage, real QUAY project timelines and what adds time.

Renovate or Relocate Your Office? How to Decide
Renovate when the lease, location and building still work; relocate when they don’t. How to compare lease timing, cost, disruption and landlord allowances, with a real QUAY office fit-out.

Do You Need a Permit for a Basement Renovation? Vancouver Rules for Finishing a Basement
Which basement work needs a building, plumbing, electrical or gas permit in the City of Vancouver, what is exempt, the permit steps and what happens if you skip one.
Planning a Renovation in Vancouver?
Speak with our team about scope, budget, and realistic timelines before you commit.